Depending on the requirements of associated planning conditions, applicants and developers, particularly in the London Borough of Hammersmith and Fulham (LBHF) and the Royal Borough of Kensington and Chelsea (RBKC), are often requested to ensure that Airwave / TETRA coverage is not adversely impacted by new or consented development. This requirement helps protect public safety around the site and in other local public areas by addressing signal interference arising from the proposed or consented development. The Airwave network is owned and operated by Airwave Solutions Limited, part of Motorola Solutions. The Airwave network meets the mobile radio needs of public safety organisations (such as ambulance, fire and police services), utility companies, and other enterprises that provide critical voice and data communications services. We undertake pre-construction and post-construction Airwave / TETRA network surveys to determine coverage around proposed development and sites, as well as any areas identified in associated planning conditions. These technical assessments can be used to discharge associated planning conditions. The equipment used to assess network coverage is provided by Rohde & Schwarz. We record and analyse TETRA signal measurements using signal-processing software to produce detailed coverage maps.

Since 2012, such surveys have been required for the Westfield Shopping Centre expansions, West End Gate (Paddington Green), Greenford Quay (Greystar), and the majority of schemes on Wood Lane and around White City (W12), in LBHF.

The mapping data used in our issued reports is provided by Ordnance Survey (OS), under the terms of the Open Government Licence. Contains OS data © Crown copyright and database right 2026.