GTECH PLANNING RESOURCES
UK Telecommunications Planning Policies & Electronic Interference
Planning policy database. Identify telecommunications, digital connectivity and electronic interference policy requirements to enable your proposed renewable energy or building project planning application submission meets all relevant policy and planning requirements.
Choose a section and country / location to find the policies, plans or submission requirements relevant to your proposed development or project.
Try GTech’s free microwave link checker | Explore aviation safeguarding | Discuss your planning submission
Barking and Dagenham: adopted plans and communications policyAdopted local plan — 18 September 2024Local Plan 2020–2037Requirements, plan status and sources
Local Plan 2020–2037
Adopted position: 18 September 2024.
Communications and development: Digital connectivity and telecommunications provisions, printed pages 164–165: SI6-aligned network provision, connections to area-wide networks, and siting/design of apparatus. Read the two facing-page policies separately.
Emerging-plan check: No separate replacement borough-wide draft verified; do not use the pre-adoption 2020–2024 consultation versions as current emerging policy.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Barnet: adopted plans and communications policyAdopted local plan — 4 March 2025Local Plan 2021–2036Requirements, plan status and sources
Local Plan 2021–2036
Adopted position: 4 March 2025.
Communications and development: TRC04: Digital Communication and Connectivity. Use the adopted wording; the examination note is supporting evidence rather than a separate adopted policy.
Emerging-plan check: The previous Local Plan review has reached adoption. No separate replacement borough-wide draft verified in this review.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Bexley: adopted plans and communications policyAdopted local plan — 26 April 2023Bexley Local PlanRequirements, plan status and sources
Bexley Local Plan
Adopted position: 26 April 2023.
Communications and development: DP8: Telecommunications and digital infrastructure addresses new/upgraded equipment, shared facilities, siting, design and amenity.
Replacement or review: Local Plan review programme — Review programme in the 2025 Local Development Scheme; this is not evidence of an adopted replacement or a published replacement policy text.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Bexley: Local Plan review programmeReview programme / focused review — see scopeReview programme in the 2025 Local Development Scheme; this is not evidence of an adopted replacement or a published replacement policy text.Requirements, plan status and sources
Local Plan review programme
Published position: Review programme in the 2025 Local Development Scheme; this is not evidence of an adopted replacement or a published replacement policy text.
Current adopted baseline: Bexley Local Plan (26 April 2023).
How to use this entry: A timetable or focused-review programme is not adopted policy. Check whether relevant draft text has actually been published and whether the review covers telecommunications. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Brent: adopted plans and communications policyAdopted local plan — 24 February 2022Local Plan 2019–2041Requirements, plan status and sources
Local Plan 2019–2041
Adopted position: 24 February 2022.
Communications and development: BD2 and supporting paragraph 6.1.19(b) address tall-building functional impacts, including telecommunications. The existing detailed BD2 and reception-validation entries remain available.
Replacement or review: New Brent Local Plan — Scoping consultation ran 2–30 September 2026. The published timetable expects plan preparation to start on 31 October 2026; a scoping programme is not a replacement adopted plan.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Brent: New Brent Local PlanEmerging / draft plan — not adoptedScoping consultation ran 2–30 September 2026. The published timetable expects plan preparation to start on 31 October 2026; a scoping programme is not a replacement adopted plan.Requirements, plan status and sources
New Brent Local Plan
Published position: Scoping consultation ran 2–30 September 2026. The published timetable expects plan preparation to start on 31 October 2026; a scoping programme is not a replacement adopted plan.
Current adopted baseline: Local Plan 2019–2041 (24 February 2022).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Bromley: adopted plans and communications policyAdopted local plan — 16 January 2019Bromley Local PlanRequirements, plan status and sources
Bromley Local Plan
Adopted position: 16 January 2019.
Communications and development: Policy 89: Telecommunications Development covers need, alternative sites/shared structures, design and relevant technical evidence.
Replacement or review: Local Plan review — Direction of Travel consultation July–September 2025 and published review evidence. The 2019 plan remains the adopted borough plan; follow the review page for subsequent draft stages.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Bromley: Local Plan reviewEmerging / draft plan — not adoptedDirection of Travel consultation July–September 2025 and published review evidence. The 2019 plan remains the adopted borough plan; follow the review page for subsequent draft stages.Requirements, plan status and sources
Local Plan review
Published position: Direction of Travel consultation July–September 2025 and published review evidence. The 2019 plan remains the adopted borough plan; follow the review page for subsequent draft stages.
Current adopted baseline: Bromley Local Plan (16 January 2019).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Camden: adopted plans and communications policyAdopted local plan — 2017 / 2013Camden Local Plan 2017 and Site Allocations 2013Requirements, plan status and sources
Camden Local Plan 2017 and Site Allocations 2013
Adopted position: 2017 / 2013.
Communications and development: Read with the adopted Digital Infrastructure Camden Planning Guidance (March 2018). The CPG explains implementation and has a different status from the Local Plan.
Replacement or review: New Camden Local Plan — Submitted 3 October 2025; examination hearings May–June 2026; main modifications published in October 2026. Emerging plan with modifications, not adopted replacement policy.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Camden: New Camden Local PlanEmerging / draft plan — not adoptedSubmitted 3 October 2025; examination hearings May–June 2026; main modifications published in October 2026. Emerging plan with modifications, not adopted replacement policy.Requirements, plan status and sources
New Camden Local Plan
Published position: Submitted 3 October 2025; examination hearings May–June 2026; main modifications published in October 2026. Emerging plan with modifications, not adopted replacement policy.
Current adopted baseline: Camden Local Plan 2017 and Site Allocations 2013 (2017 / 2013).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
City of London: adopted plans and communications policyAdopted local plan — 2015Local Plan 2015Requirements, plan status and sources
Local Plan 2015
Adopted position: 2015.
Communications and development: CS2: Utilities Infrastructure covers infrastructure planning, provider engagement and protection/relocation of existing essential utilities and telecommunications.
Replacement or review: City Plan 2040 — Examination and modifications stage. September 2026 updates address the ministerial direction and heritage matters; anticipated adoption is not completed adoption.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Croydon: adopted plans and communications policyAdopted local plan — 2018Croydon Local Plan 2018Requirements, plan status and sources
Croydon Local Plan 2018
Adopted position: 2018.
Communications and development: DM33: Telecommunications. Also read the separate published TV, mobile and radio reception validation entry; checklist status and policy status are distinct.
Replacement or review: Local Plan partial review — Submitted review undergoing examination and main-modification work. Council forward-plan records indicate an adoption decision is due in November 2026; that programme does not establish adoption today.
Official adopted-plan source · Official review / emerging-plan source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Croydon: Local Plan partial reviewEmerging / draft plan — not adoptedSubmitted review undergoing examination and main-modification work. Council forward-plan records indicate an adoption decision is due in November 2026; that programme does not establish adoption today.Requirements, plan status and sources
Local Plan partial review
Published position: Submitted review undergoing examination and main-modification work. Council forward-plan records indicate an adoption decision is due in November 2026; that programme does not establish adoption today.
Current adopted baseline: Croydon Local Plan 2018 (2018).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Ealing: adopted plans and communications policyAdopted local plan — 2012 / 2013Development Strategy 2026 and Development Management DPDRequirements, plan status and sources
Development Strategy 2026 and Development Management DPD
Adopted position: 2012 / 2013.
Communications and development: Use the adopted DPD collection and London Plan D9/SI6 when assessing design, infrastructure and effects on existing communications. The plan-period end year does not by itself revoke an adopted document.
Replacement or review: New Local Plan 2024–2039 — Submitted 18 November 2024 and under independent examination. Read the submission and examination versions rather than treating the draft as adopted.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Ealing: New Local Plan 2024–2039Emerging / draft plan — not adoptedSubmitted 18 November 2024 and under independent examination. Read the submission and examination versions rather than treating the draft as adopted.Requirements, plan status and sources
New Local Plan 2024–2039
Published position: Submitted 18 November 2024 and under independent examination. Read the submission and examination versions rather than treating the draft as adopted.
Current adopted baseline: Development Strategy 2026 and Development Management DPD (2012 / 2013).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Enfield: adopted plans and communications policyAdopted local plan — 2010 / 2014; area plans 2014–2020Core Strategy 2010, Development Management Document 2014 and adopted area plansRequirements, plan status and sources
Core Strategy 2010, Development Management Document 2014 and adopted area plans
Adopted position: 2010 / 2014; area plans 2014–2020.
Communications and development: The adopted collection includes North Circular, North East Enfield and Edmonton Leeside area plans. Check the site-specific plan/map alongside London Plan communications policies.
Replacement or review: Enfield Local Plan 2019–2039 — Submitted August 2024 and undergoing examination. Draft E11 (Creating a smart and digitally connected Borough) includes protection of existing digital/communications and aviation infrastructure and mitigation; retain emerging status.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Enfield: Enfield Local Plan 2019–2039Emerging / draft plan — not adoptedSubmitted August 2024 and undergoing examination. Draft E11 (Creating a smart and digitally connected Borough) includes protection of existing digital/communications and aviation infrastructure and mitigation; retain emerging status.Requirements, plan status and sources
Enfield Local Plan 2019–2039
Published position: Submitted August 2024 and undergoing examination. Draft E11 (Creating a smart and digitally connected Borough) includes protection of existing digital/communications and aviation infrastructure and mitigation; retain emerging status.
Current adopted baseline: Core Strategy 2010, Development Management Document 2014 and adopted area plans (2010 / 2014; area plans 2014–2020).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Greenwich: adopted plans and communications policyAdopted local plan — 2014Core Strategy with Detailed PoliciesRequirements, plan status and sources
Core Strategy with Detailed Policies
Adopted position: 2014.
Communications and development: DH(c): Telecommunications Development. Assess the scheme against the adopted local text and London Plan D9/SI6; the draft replacement has separate status.
Replacement or review: Royal Greenwich Local Plan 2040 — Regulation 19 consultation closed 6 September 2026. Council states intended submission before the end of 2026 and examination in 2027; no completed submission or adoption inferred from those intentions.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Greenwich: Royal Greenwich Local Plan 2040Emerging / draft plan — not adoptedRegulation 19 consultation closed 6 September 2026. Council states intended submission before the end of 2026 and examination in 2027; no completed submission or adoption inferred from those intentions.Requirements, plan status and sources
Royal Greenwich Local Plan 2040
Published position: Regulation 19 consultation closed 6 September 2026. Council states intended submission before the end of 2026 and examination in 2027; no completed submission or adoption inferred from those intentions.
Current adopted baseline: Core Strategy with Detailed Policies (2014).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Hackney: adopted plans and communications policyAdopted local plan — 22 July 2020Local Plan 2033 (LP33)Requirements, plan status and sources
Local Plan 2033 (LP33)
Adopted position: 22 July 2020.
Communications and development: Check the adopted LP33 and applicable area-plan policies. Former LLDC land has a distinct plan history and must be checked against the council’s LLDC policy documents.
Replacement or review: New Local Plan for 2029; area-action-plan work — Council is preparing a replacement expected for 2029. Future Shoreditch and Stamford Hill area-action-plan documents are additional geographically limited workstreams; use each current status page rather than assuming borough-wide adoption.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Hackney: New Local Plan for 2029; area-action-plan workEmerging / draft plan — not adoptedCouncil is preparing a replacement expected for 2029. Future Shoreditch and Stamford Hill area-action-plan documents are additional geographically limited workstreams; use each current status page rather than assuming borough-wide adoption.Requirements, plan status and sources
New Local Plan for 2029; area-action-plan work
Published position: Council is preparing a replacement expected for 2029. Future Shoreditch and Stamford Hill area-action-plan documents are additional geographically limited workstreams; use each current status page rather than assuming borough-wide adoption.
Current adopted baseline: Local Plan 2033 (LP33) (22 July 2020).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Hammersmith and Fulham: adopted plans and communications policyAdopted local plan — 28 February 2018Local Plan 2018Requirements, plan status and sources
Local Plan 2018
Adopted position: 28 February 2018.
Communications and development: Use the adopted plan with London Plan D9/SI6. DH9 Telecommunications and Digital Connectivity is identified in the replacement draft; do not silently import replacement wording into the adopted plan.
Replacement or review: Local Plan review — Regulation 19 draft — Cabinet approved the Regulation 19 draft and supporting documents for consultation on 6 July 2026. The draft is emerging; the approval to consult is not adoption.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Hammersmith and Fulham: Local Plan review — Regulation 19 draftEmerging / draft plan — not adoptedCabinet approved the Regulation 19 draft and supporting documents for consultation on 6 July 2026. The draft is emerging; the approval to consult is not adoption.Requirements, plan status and sources
Local Plan review — Regulation 19 draft
Published position: Cabinet approved the Regulation 19 draft and supporting documents for consultation on 6 July 2026. The draft is emerging; the approval to consult is not adoption.
Current adopted baseline: Local Plan 2018 (28 February 2018).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Haringey: adopted plans and communications policyAdopted local plan — 2017 suite (Strategic Policies originally 2013)Strategic Policies, Development Management DPD, Site Allocations and Tottenham AAPRequirements, plan status and sources
Strategic Policies, Development Management DPD, Site Allocations and Tottenham AAP
Adopted position: 2017 suite (Strategic Policies originally 2013).
Communications and development: DM54: Facilitating Telecommunications Development addresses installations and broadband connectivity. Read alongside the adopted 2018 Planning Obligations SPD’s telecommunications section.
Replacement or review: New Haringey Local Plan — Regulation 18 draft published in 2025, including Part 3 borough-wide policies and D7 Advertisements and Telecommunications. Review the published draft and programme; do not label it adopted. The current forward plan schedules a Regulation 19 approval decision for 10 November 2026; that stage is not assumed completed.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Haringey: New Haringey Local PlanEmerging / draft plan — not adoptedRegulation 18 draft published in 2025, including Part 3 borough-wide policies and D7 Advertisements and Telecommunications. Review the published draft and programme; do not label it adopted. The current forward plan schedules a Regulation 19 approval decision for 10 November 2026; that stage is not assumed completed.Requirements, plan status and sources
New Haringey Local Plan
Published position: Regulation 18 draft published in 2025, including Part 3 borough-wide policies and D7 Advertisements and Telecommunications. Review the published draft and programme; do not label it adopted. The current forward plan schedules a Regulation 19 approval decision for 10 November 2026; that stage is not assumed completed.
Current adopted baseline: Strategic Policies, Development Management DPD, Site Allocations and Tottenham AAP (2017 suite (Strategic Policies originally 2013)).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Harrow: adopted plans and communications policyAdopted local plan — 24 March 2026Local Plan 2021–2041Requirements, plan status and sources
Local Plan 2021–2041
Adopted position: 24 March 2026.
Communications and development: SI4: Digital and Communications Infrastructure. Use the adopted numbering; earlier drafts used CI4. The 2012/2013 plan suite has been replaced.
Emerging-plan check: The replacement plan has completed adoption. Earlier Regulation 18/19 and examination documents are historical supporting records, not a parallel live emerging plan.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Havering: adopted plans and communications policyAdopted local plan — 17 November 2021Local Plan 2016–2031 and retained site allocationsRequirements, plan status and sources
Local Plan 2016–2031 and retained site allocations
Adopted position: 17 November 2021.
Communications and development: Policy 25: Digital infrastructure covers broadband and telecommunications coverage, future-proofing and environmental/amenity considerations. Check retained allocations as applicable.
Replacement or review: Local Plan update — Council’s current update page identifies reviewing and collecting evidence as its current stage. Do not treat dates projected in the older LDS as proof that later consultation stages have occurred.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Havering: Local Plan updateEmerging / draft plan — not adoptedCouncil’s current update page identifies reviewing and collecting evidence as its current stage. Do not treat dates projected in the older LDS as proof that later consultation stages have occurred.Requirements, plan status and sources
Local Plan update
Published position: Council’s current update page identifies reviewing and collecting evidence as its current stage. Do not treat dates projected in the older LDS as proof that later consultation stages have occurred.
Current adopted baseline: Local Plan 2016–2031 and retained site allocations (17 November 2021).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Hillingdon: adopted plans and communications policyAdopted local plan — 2012 / 16 January 2020Local Plan Part 1 and Part 2Requirements, plan status and sources
Local Plan Part 1 and Part 2
Adopted position: 2012 / 16 January 2020.
Communications and development: Part 2 DMHB21: Telecommunications covers siting, visual/heritage/environmental effects, alternatives/sharing and conformity evidence. The September 2014 draft’s DMHB26 numbering is historical.
Replacement or review: New Local Plan preparation — Notice of intention published 12 May 2026 under the new plan-making system; published timetable and evidence gathering. This is plan preparation, not an adopted replacement.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Hillingdon: New Local Plan preparationEmerging / draft plan — not adoptedNotice of intention published 12 May 2026 under the new plan-making system; published timetable and evidence gathering. This is plan preparation, not an adopted replacement.Requirements, plan status and sources
New Local Plan preparation
Published position: Notice of intention published 12 May 2026 under the new plan-making system; published timetable and evidence gathering. This is plan preparation, not an adopted replacement.
Current adopted baseline: Local Plan Part 1 and Part 2 (2012 / 16 January 2020).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Hounslow: adopted plans and communications policyAdopted local plan — 2015Local Plan 2015–2030Requirements, plan status and sources
Local Plan 2015–2030
Adopted position: 2015.
Communications and development: Check telecommunications policy EC4 in the appropriate adopted plan version. The current examination combines updated borough-wide policy with allocations and area-based work.
Replacement or review: Local Plan 2020–2041 — Under independent examination; Stage 1 hearings took place in January 2026 and further examination material is published. Older projected adoption dates are not adoption notices.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Hounslow: Local Plan 2020–2041Emerging / draft plan — not adoptedUnder independent examination; Stage 1 hearings took place in January 2026 and further examination material is published. Older projected adoption dates are not adoption notices.Requirements, plan status and sources
Local Plan 2020–2041
Published position: Under independent examination; Stage 1 hearings took place in January 2026 and further examination material is published. Older projected adoption dates are not adoption notices.
Current adopted baseline: Local Plan 2015–2030 (2015).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Islington: adopted plans and communications policyAdopted local plan — 28 September 2023Strategic and Development Management Policies, Site Allocations and Bunhill/Clerkenwell AAPRequirements, plan status and sources
Strategic and Development Management Policies, Site Allocations and Bunhill/Clerkenwell AAP
Adopted position: 28 September 2023.
Communications and development: ST3: Telecommunications, communications and utilities equipment. Check the relevant site allocation and AAP where applicable; the older 2011/2013 suite is superseded.
Replacement or review: Focused Gypsy and Traveller policy review — A focused review is published separately. Its scope is accommodation needs; do not assume it replaces ST3 or introduces a new borough-wide telecommunications policy.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Islington: Focused Gypsy and Traveller policy reviewReview programme / focused review — see scopeA focused review is published separately. Its scope is accommodation needs; do not assume it replaces ST3 or introduces a new borough-wide telecommunications policy.Requirements, plan status and sources
Focused Gypsy and Traveller policy review
Published position: A focused review is published separately. Its scope is accommodation needs; do not assume it replaces ST3 or introduces a new borough-wide telecommunications policy.
Current adopted baseline: Strategic and Development Management Policies, Site Allocations and Bunhill/Clerkenwell AAP (28 September 2023).
How to use this entry: A timetable or focused-review programme is not adopted policy. Check whether relevant draft text has actually been published and whether the review covers telecommunications. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Kensington and Chelsea: adopted plans and communications policyAdopted local plan — 24 July 2024Local Plan 2024Requirements, plan status and sources
Local Plan 2024
Adopted position: 24 July 2024.
Communications and development: Use the adopted 2024 plan with London Plan D9/SI6. Do not rely on the superseded 2019 plan or pre-adoption NLPR draft when identifying current policy.
Emerging-plan check: The New Local Plan Review has reached adoption. No separate replacement borough-wide draft verified in this review; archived NLPR consultation pages are historical.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Kingston upon Thames: adopted plans and communications policyAdopted local plan — 2012 / 2008Core Strategy 2012 and Kingston Town Centre AAP 2008Requirements, plan status and sources
Core Strategy 2012 and Kingston Town Centre AAP 2008
Adopted position: 2012 / 2008.
Communications and development: Apply the adopted development-plan collection and London Plan communications policies. The emerging KD8 policy is not part of the adopted Core Strategy.
Replacement or review: New Local Plan 2028–2043 — Final Regulation 19 draft approved for consultation in June 2026; intended submission December 2026. Draft KD8: Telecommunications and Digital Infrastructure is a relevant replacement provision.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Kingston upon Thames: New Local Plan 2028–2043Emerging / draft plan — not adoptedFinal Regulation 19 draft approved for consultation in June 2026; intended submission December 2026. Draft KD8: Telecommunications and Digital Infrastructure is a relevant replacement provision.Requirements, plan status and sources
New Local Plan 2028–2043
Published position: Final Regulation 19 draft approved for consultation in June 2026; intended submission December 2026. Draft KD8: Telecommunications and Digital Infrastructure is a relevant replacement provision.
Current adopted baseline: Core Strategy 2012 and Kingston Town Centre AAP 2008 (2012 / 2008).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Lambeth: adopted plans and communications policyAdopted local plan — 2021Lambeth Local Plan 2020–2035Requirements, plan status and sources
Lambeth Local Plan 2020–2035
Adopted position: 2021.
Communications and development: T10: Digital connectivity infrastructure. Read with London Plan SI6 and the applicable tall-building provisions.
Replacement or review: New Lambeth Local Plan — Scoping consultation ran 1 September–13 October 2026. The published timetable identifies Gateway 1 in October 2026; this is early preparation, not an adopted or examined replacement.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Lambeth: New Lambeth Local PlanEmerging / draft plan — not adoptedScoping consultation ran 1 September–13 October 2026. The published timetable identifies Gateway 1 in October 2026; this is early preparation, not an adopted or examined replacement.Requirements, plan status and sources
New Lambeth Local Plan
Published position: Scoping consultation ran 1 September–13 October 2026. The published timetable identifies Gateway 1 in October 2026; this is early preparation, not an adopted or examined replacement.
Current adopted baseline: Lambeth Local Plan 2020–2035 (2021).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Lewisham: adopted plans and communications policyAdopted local plan — 16 July 2025Local Plan 2020–2040Requirements, plan status and sources
Local Plan 2020–2040
Adopted position: 16 July 2025.
Communications and development: TR7: Digital connectivity. The former Core Strategy and Development Management Local Plan have been replaced; distinguish their historical policy references from the adopted 2025 plan.
Emerging-plan check: The new borough-wide plan has reached adoption. No separate replacement borough-wide draft verified in this review.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Newham: adopted plans and communications policyAdopted local plan — 2018 / LLDC 2020Local Plan 2018; applicable former LLDC-area policiesRequirements, plan status and sources
Local Plan 2018; applicable former LLDC-area policies
Adopted position: 2018 / LLDC 2020.
Communications and development: Check the adopted Local Plan and whether former LLDC land has additional applicable policies. A completed examination of the replacement does not itself replace the adopted plan.
Replacement or review: Newham Local Plan review — Inspector’s Report received 18 August 2026, concluding examination; council’s review page says formal adoption will be considered in due course. Adoption not confirmed by the checked source. Draft W4 and the 2026 main modifications address utilities and digital connectivity.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Newham: Newham Local Plan reviewEmerging / draft plan — not adoptedInspector’s Report received 18 August 2026, concluding examination; council’s review page says formal adoption will be considered in due course. Adoption not confirmed by the checked source. Draft W4 and the 2026 main modifications address utilities and digital connectivity.Requirements, plan status and sources
Newham Local Plan review
Published position: Inspector’s Report received 18 August 2026, concluding examination; council’s review page says formal adoption will be considered in due course. Adoption not confirmed by the checked source. Draft W4 and the 2026 main modifications address utilities and digital connectivity.
Current adopted baseline: Local Plan 2018; applicable former LLDC-area policies (2018 / LLDC 2020).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Redbridge: adopted plans and communications policyAdopted local plan — 15 March 2018Local Plan 2015–2030Requirements, plan status and sources
Local Plan 2015–2030
Adopted position: 15 March 2018.
Communications and development: LP25: Telecommunications includes installation criteria and digital infrastructure. Read the separate Planning Obligations SPD for connectivity provision and provider engagement.
Replacement or review: Local Plan review programme — March 2025 Local Development Scheme sets out a comprehensive review programme. Treat the timetable as preparation evidence; no replacement adopted plan inferred.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Redbridge: Local Plan review programmeReview programme / focused review — see scopeMarch 2025 Local Development Scheme sets out a comprehensive review programme. Treat the timetable as preparation evidence; no replacement adopted plan inferred.Requirements, plan status and sources
Local Plan review programme
Published position: March 2025 Local Development Scheme sets out a comprehensive review programme. Treat the timetable as preparation evidence; no replacement adopted plan inferred.
Current adopted baseline: Local Plan 2015–2030 (15 March 2018).
How to use this entry: A timetable or focused-review programme is not adopted policy. Check whether relevant draft text has actually been published and whether the review covers telecommunications. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Richmond upon Thames: adopted plans and communications policyAdopted local plan — 7 October 2025Local Plan 2024–2039Requirements, plan status and sources
Local Plan 2024–2039
Adopted position: 7 October 2025.
Communications and development: Policy 27: Telecommunications and Digital Infrastructure. The adopted replacement supersedes earlier local-plan policy; pre-adoption publication and examination pages are background records.
Emerging-plan check: The replacement plan was adopted in October 2025. No separate replacement borough-wide draft verified. The updated validation checklist took effect on 20 February 2026.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Southwark: adopted plans and communications policyAdopted local plan — 23 February 2022Southwark Plan 2019–2036Requirements, plan status and sources
Southwark Plan 2019–2036
Adopted position: 23 February 2022.
Communications and development: P44 addresses broadband delivery for future occupiers. Read with London Plan D9/SI6 for effects on existing TV/radio and communications networks; fibre provision alone does not resolve reception interference.
Replacement or review: Southwark Plan full review — Council adopted a 2026–2029 Local Development Scheme and recorded commencement of a full review in 2026. Programme/preparation status; no adopted replacement inferred.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Southwark: Southwark Plan full reviewEmerging / draft plan — not adoptedCouncil adopted a 2026–2029 Local Development Scheme and recorded commencement of a full review in 2026. Programme/preparation status; no adopted replacement inferred.Requirements, plan status and sources
Southwark Plan full review
Published position: Council adopted a 2026–2029 Local Development Scheme and recorded commencement of a full review in 2026. Programme/preparation status; no adopted replacement inferred.
Current adopted baseline: Southwark Plan 2019–2036 (23 February 2022).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Sutton: adopted plans and communications policyAdopted local plan — 26 February 2018Local Plan 2016–2031Requirements, plan status and sources
Local Plan 2016–2031
Adopted position: 26 February 2018.
Communications and development: Policy 23: Telecommunications covers siting/design, alternatives and sharing, future network demand and relevant exposure-conformity evidence.
Replacement or review: Draft Sutton Local Plan 2024–2041 (2026 publication) — Published draft consultation closed 31 July 2026. The document’s 2026 title and an older adoption forecast do not make it adopted.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Sutton: Draft Sutton Local Plan 2024–2041 (2026 publication)Emerging / draft plan — not adoptedPublished draft consultation closed 31 July 2026. The document’s 2026 title and an older adoption forecast do not make it adopted.Requirements, plan status and sources
Draft Sutton Local Plan 2024–2041 (2026 publication)
Published position: Published draft consultation closed 31 July 2026. The document’s 2026 title and an older adoption forecast do not make it adopted.
Current adopted baseline: Local Plan 2016–2031 (26 February 2018).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Tower Hamlets: adopted plans and communications policyAdopted local plan — 15 January 2020 / LLDC 2020Local Plan 2031: Managing Growth and Sharing Benefits; applicable LLDC policiesRequirements, plan status and sources
Local Plan 2031: Managing Growth and Sharing Benefits; applicable LLDC policies
Adopted position: 15 January 2020 / LLDC 2020.
Communications and development: Read adopted tall-building/infrastructure policies with London Plan D9/SI6. Council confirms LLDC plan policies remain relevant in Hackney Wick, Fish Island and Bromley-by-Bow until the replacement is adopted.
Replacement or review: New Local Plan 2023–2038 — Consolidated draft submitted 16 February 2026 and under examination. Published draft DV7 Utilities and digital connectivity includes digital-infrastructure evidence; read the submitted consolidation and modifications for current wording.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Tower Hamlets: New Local Plan 2023–2038Emerging / draft plan — not adoptedConsolidated draft submitted 16 February 2026 and under examination. Published draft DV7 Utilities and digital connectivity includes digital-infrastructure evidence; read the submitted consolidation and modifications for current wording.Requirements, plan status and sources
New Local Plan 2023–2038
Published position: Consolidated draft submitted 16 February 2026 and under examination. Published draft DV7 Utilities and digital connectivity includes digital-infrastructure evidence; read the submitted consolidation and modifications for current wording.
Current adopted baseline: Local Plan 2031: Managing Growth and Sharing Benefits; applicable LLDC policies (15 January 2020 / LLDC 2020).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Waltham Forest: adopted plans and communications policyAdopted local plan — 29 February 2024Local Plan Part 1: Shaping the Borough 2020–2035Requirements, plan status and sources
Local Plan Part 1: Shaping the Borough 2020–2035
Adopted position: 29 February 2024.
Communications and development: Policy 69: Digital Infrastructure addresses full-fibre delivery for major schemes, apparatus and existing digital infrastructure. Paragraph 15.50 identifies impact-statement/mitigation-plan evidence where significant adverse effects are identified.
Replacement or review: Local Plan Part 2: Site Allocations — Inspector’s Report published 18 March 2026; the checked examination pages confirm completion of examination but do not confirm formal adoption. Record as post-examination, adoption unconfirmed.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Waltham Forest: Local Plan Part 2: Site AllocationsEmerging / draft plan — not adoptedInspector’s Report published 18 March 2026; the checked examination pages confirm completion of examination but do not confirm formal adoption. Record as post-examination, adoption unconfirmed.Requirements, plan status and sources
Local Plan Part 2: Site Allocations
Published position: Inspector’s Report published 18 March 2026; the checked examination pages confirm completion of examination but do not confirm formal adoption. Record as post-examination, adoption unconfirmed.
Current adopted baseline: Local Plan Part 1: Shaping the Borough 2020–2035 (29 February 2024).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Wandsworth: adopted plans and communications policyAdopted local plan — 19 July 2023 / 4 March 2026Local Plan 2023–2038, as amended by the adopted 2026 Partial ReviewRequirements, plan status and sources
Local Plan 2023–2038, as amended by the adopted 2026 Partial Review
Adopted position: 19 July 2023 / 4 March 2026.
Communications and development: LP22: Utilities and Digital Connectivity Infrastructure. Use the 2023 plan together with the Partial Review’s six replacement policies; the utilities checklist expressly refers to LP22.
Replacement or review: Full Local Plan review programme — The March 2025 Local Development Scheme includes a future full review. The housing-focused Partial Review itself is already adopted and must not remain labelled emerging.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Wandsworth: Full Local Plan review programmeReview programme / focused review — see scopeThe March 2025 Local Development Scheme includes a future full review. The housing-focused Partial Review itself is already adopted and must not remain labelled emerging.Requirements, plan status and sources
Full Local Plan review programme
Published position: The March 2025 Local Development Scheme includes a future full review. The housing-focused Partial Review itself is already adopted and must not remain labelled emerging.
Current adopted baseline: Local Plan 2023–2038, as amended by the adopted 2026 Partial Review (19 July 2023 / 4 March 2026).
How to use this entry: A timetable or focused-review programme is not adopted policy. Check whether relevant draft text has actually been published and whether the review covers telecommunications. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Westminster: adopted plans and communications policyAdopted local plan — 21 January 2026City Plan 2019–2040 (2026)Requirements, plan status and sources
City Plan 2019–2040 (2026)
Adopted position: 21 January 2026.
Communications and development: Use the current 2026 numbering. Read digital/telecommunications and building-height provisions with the March 2026 Planning Obligations and Affordable Housing SPD and the 2026 Code of Construction Practice.
Replacement or review: New Westminster City Plan — Council has published notice of intention and a timetable under the 2026 plan-making system. This new preparation work is separate from the January 2026 adopted Partial Review.
Official adopted-plan source · Official review / emerging-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Westminster: New Westminster City PlanEmerging / draft plan — not adoptedCouncil has published notice of intention and a timetable under the 2026 plan-making system. This new preparation work is separate from the January 2026 adopted Partial Review.Requirements, plan status and sources
New Westminster City Plan
Published position: Council has published notice of intention and a timetable under the 2026 plan-making system. This new preparation work is separate from the January 2026 adopted Partial Review.
Current adopted baseline: City Plan 2019–2040 (2026) (21 January 2026).
How to use this entry: Compare the relevant draft provisions and subsequent modifications with the adopted plan. State the document version and examination/consultation stage in the assessment. The weight of emerging policy depends on its stage, unresolved objections and consistency with national policy.
Official emerging-plan / review source · Current adopted-plan source
London review: 17 October 2026.
Brent: Digital Connectivity Infrastructure PlanPublished council validation checklistNew residential and commercial development.Requirements, plan status and sources
Digital Connectivity Infrastructure Plan
Trigger and scope: New residential and commercial development.
Information to provide: The published full/outline/technical-details checklist identifies a Digital Connectivity Infrastructure Plan. Set out connectivity infrastructure provision and read it alongside the separate TV/radio reception assessment trigger; the documents answer different questions.
Read the official council requirements
London review: 17 October 2026.
Camden: Telecommunications Report — installation applicationsPublished 20 November 2025 — printed page 30Prior-notification and planning applications for infrastructure including masts, base stations and cabinets.Requirements, plan status and sources
Telecommunications Report — installation applications
Trigger and scope: Prior-notification and planning applications for infrastructure including masts, base stations and cabinets.
Information to provide: The November 2025 Local Area Requirements request consultation outcomes, evidence of alternatives/shared structures for new installations, and relevant ICNIRP self-certification. This is an apparatus-installation requirement; do not apply it automatically to every neighbouring building scheme.
Read the official council requirements
London review: 17 October 2026.
City of London: Telecommunications installation supporting informationCouncil application guidance — updated 9 June 2025Applications/consultations for installation of telecommunications equipment.Requirements, plan status and sources
Telecommunications installation supporting information
Trigger and scope: Applications/consultations for installation of telecommunications equipment.
Information to provide: The council specifies scaled site/building drawings, details of the equipment and a valid conformity certificate for Code Operators’ antennae. Its installation-specific requirements and DPAR checklist are distinct from assessing obstruction of an existing network by a new building.
Read the official council requirements
London review: 17 October 2026.
Enfield: Utilities and foul sewage assessmentLocal Validation Requirements — 14 October 2024, printed page 45Major developments involving connection to utilities infrastructure, including telecommunications.Requirements, plan status and sources
Utilities and foul sewage assessment
Trigger and scope: Major developments involving connection to utilities infrastructure, including telecommunications.
Information to provide: Section 16 requests provider consultation, evidence that services will not be placed under undue stress, incorporation of equipment requirements and agreement on relocation/protection where existing infrastructure is affected. This is a utilities requirement, not a universal separate broadband or reception-report requirement.
Read the official council requirements
London review: 17 October 2026.
Hillingdon: ICNIRP statement — telecommunications apparatusPublished council checklist — printed page 36Prior-approval and full-planning applications for telecommunications apparatus.Requirements, plan status and sources
ICNIRP statement — telecommunications apparatus
Trigger and scope: Prior-approval and full-planning applications for telecommunications apparatus.
Information to provide: The February 2024 checklist requests evidence of consultation with schools/day nurseries and a statement confirming compliance when operational. The scope is apparatus applications; it does not establish a blanket reception survey requirement for unrelated development.
Read the official council requirements
London review: 17 October 2026.
Kensington and Chelsea: Tall Buildings Impact Assessment: telecommunicationsPublished submission requirements — Note 34, printed page 44New tall-building applications, using the London Plan definition referenced in Note 34.Requirements, plan status and sources
Tall Buildings Impact Assessment: telecommunications
Trigger and scope: New tall-building applications, using the London Plan definition referenced in Note 34.
Information to provide: The published submission list includes telecommunications within the physical impact assessment, alongside microclimate and subterranean infrastructure. Evidence should be proportionate to the proposal. The document distinguishes national validation requirements from local assessment information; do not describe every local item as mandatory for initial validation.
Read the official council requirements
London review: 17 October 2026.
Kingston upon Thames: Foul sewage and utilities assessmentLocal list — February 2024, printed pages 61–63Applications proposing new residential or non-residential units where connections to, or changes to, existing utilities are involved.Requirements, plan status and sources
Foul sewage and utilities assessment
Trigger and scope: Applications proposing new residential or non-residential units where connections to, or changes to, existing utilities are involved.
Information to provide: The February 2024 local list includes telecommunications connections and equipment within the utilities assessment. Address provider consultation, capacity, service routing and protection/relocation of affected infrastructure. Council identifies the local list as adopted from 1 May 2024.
Read the official council requirements
London review: 17 October 2026.
Lambeth: Utilities information within LIR 35Published Local Information Requirements 2024 — LIR 35All major development proposals; information may form part of the Planning Statement.Requirements, plan status and sources
Utilities information within LIR 35
Trigger and scope: All major development proposals; information may form part of the Planning Statement.
Information to provide: LIR 35, Foul Water and Water Supply Capacity and Water Utility Assessment, includes connections to existing utilities, telecommunications equipment requirements and service-routing/protection matters. Its title is water-focused but its information requirements expressly include telecommunications.
Read the official council requirements
London review: 17 October 2026.
Merton: Foul sewage and utilities statementValidation Checklist 2025, updated June 2026 — item 29, printed page 21Major development, including new build, under item 29.Requirements, plan status and sources
Foul sewage and utilities statement
Trigger and scope: Major development, including new build, under item 29.
Information to provide: The current linked 2025 checklist, updated in June 2026, includes telecommunications equipment in utility requirements and asks for agreement with the service provider where affected infrastructure needs relocation/protection. Treat this as a utilities information requirement rather than a dedicated broadcast assessment.
Read the official council requirements
London review: 17 October 2026.
Richmond upon Thames: Utilities statement and telecommunications statementChecklist effective 20 February 2026 — items 38 and 83Utilities statement: all major developments. Telecommunications statement: telecommunications development, including the Part 16/prior-approval cases specified by the council.Requirements, plan status and sources
Utilities statement and telecommunications statement
Trigger and scope: Utilities statement: all major developments. Telecommunications statement: telecommunications development, including the Part 16/prior-approval cases specified by the council.
Information to provide: The February 2026 checklist separates item 38 (capacity, equipment, service routes and protection/relocation) from item 83 (consultation, cumulative exposure certification and alternatives/sharing). Apply the appropriate scope; the installation statement is not a blanket requirement for all new buildings.
Read the official council requirements
London review: 17 October 2026.
Wandsworth: Foul Sewage and Utilities StatementOctober 2023 checklist, updated 19 December 2023 — item 21New buildings and proposals connecting to existing utilities; follow item 21 for the applicable detail.Requirements, plan status and sources
Foul Sewage and Utilities Statement
Trigger and scope: New buildings and proposals connecting to existing utilities; follow item 21 for the applicable detail.
Information to provide: The checklist includes telecommunications within infrastructure connections. Demonstrate provider consultation, capacity, incorporation of equipment requirements and agreement on protection/relocation of affected services. It cites LP22 Utilities and Digital Connectivity Infrastructure.
Read the official council requirements
London review: 17 October 2026.
Westminster: Foul Sewage and Utilities AssessmentPublished checklist updated 2024 — L18, printed page 15Major development involving connections to, or changes to, existing infrastructure.Requirements, plan status and sources
Foul Sewage and Utilities Assessment
Trigger and scope: Major development involving connections to, or changes to, existing infrastructure.
Information to provide: L18 requires capacity/provider evidence, telecommunications equipment provision and agreement on relocation/protection where development affects existing infrastructure. The checklist retains older City Plan references: use the adopted January 2026 plan numbering when reporting policy compliance.
Read the official council requirements
London review: 17 October 2026.
Blackpool: full-fibre broadband statementPublished local validation checklistMajor and minor non-residential proposals, excluding changes of use.Assessment requirements and source
Published local validation checklist
Blackpool: full-fibre broadband statement
Reference: Major and minor scale proposals (non-residential).
Submission trigger: Major and minor non-residential proposals, excluding changes of use.
Supporting evidence: Explain how the scheme will provide full-fibre broadband, or give reasons why it cannot be delivered. The checklist applies this requirement to both major and minor non-residential proposals; it does not list it under the residential headings.
GTech support: GTech can assess available networks and prepare proportionate connectivity evidence for the proposed development.
Council local validation checklist →
Entry reviewed 17 October 2026.
Manchester: Broadband Connectivity AssessmentCouncil-published checklist — revised January 2020New-build residential development; confirm the evidence needed for the application.Assessment requirements and source
Council-published checklist — revised January 2020
Manchester: Broadband Connectivity Assessment
Reference: Full, Outline, Reserved Matters and Variation/Removal of Conditions checklist, page 3.
Submission trigger: New-build residential development; confirm the evidence needed for the application.
Supporting evidence: The Broadband Connectivity Assessment item says new-build housing must include measures enabling digital connections, with reference to the government’s Data Ducting Infrastructure Guidance. It appears under additional information that may be requested. This is separate from Manchester’s TV/radio reception requirement.
GTech support: GTech can assess available networks and prepare proportionate connectivity evidence for the proposed development.
Council checklist, page 3 → · Council checklist publication page →
Entry reviewed 17 October 2026.
Milton Keynes: Digital Connectivity StatementAdopted validation requirements — March 2025Proposals creating new commercial or residential premises, in the full and outline application sections.Assessment requirements and source
Adopted validation requirements — March 2025
Milton Keynes: Digital Connectivity Statement
Reference: Planning Application Validation Requirements, paragraphs 4.3 and 5.6; Annex B, page 70; Plan:MK CT9.
Submission trigger: Proposals creating new commercial or residential premises, in the full and outline application sections.
Supporting evidence: Set out the approach to supplying each new property with superfast fibre broadband. The current council publication links the March 2025 requirements, replacing the older March 2023 version found in some searches. Check the relevant application-type section for the submission.
GTech support: GTech can assess available networks and prepare proportionate connectivity evidence for the proposed development.
March 2025 requirements → · Council publication and adoption information →
Entry reviewed 17 October 2026.
Newcastle upon Tyne: Digital Infrastructure StatementPublished council submission guidanceMajor planning applications, including residential and commercial development.Assessment requirements and source
Published council submission guidance
Newcastle upon Tyne: Digital Infrastructure Statement
Reference: DM35 developer process note, Part 2: Meeting the Council’s Planning Requirements.
Submission trigger: Major planning applications, including residential and commercial development.
Supporting evidence: Describe provider engagement, the connection technology and on-site works needed for service when units are occupied. The statement may form part of the Planning Statement or Design and Access Statement. For outline applications, commit to later details and explain when and how providers will be consulted.
GTech support: GTech can assess available networks and prepare proportionate connectivity evidence for the proposed development.
Council developer process note → · Council application guidance →
Entry reviewed 17 October 2026.
Stockton-on-Tees: Connectivity Statement (Broadband)Published validation checklist — March 2025All new development, where appropriate; agree applicability with the council.Assessment requirements and source
Published validation checklist — March 2025
Stockton-on-Tees: Connectivity Statement (Broadband)
Reference: National and Local Validation Requirements List, item 36, PDF page 21; policies SD6 and TI3.
Submission trigger: All new development, where appropriate; agree applicability with the council.
Supporting evidence: Explain the scheme’s broadband needs, nearby data networks and expected speeds, and the infrastructure that will connect the development to those networks or contribute to them. Retain the checklist’s qualification ‘where appropriate’; this is not an unconditional requirement for every application.
GTech support: GTech can assess available networks and prepare proportionate connectivity evidence for the proposed development.
Council validation checklist, item 36 →
Entry reviewed 17 October 2026.
Warwick District: Connectivity Statement — recommended evidenceRecommended supporting document — reviewed May 2026Residential and commercial applications — recommended, rather than required for validation.Assessment requirements and source
Recommended supporting document — reviewed May 2026
Warwick District: Connectivity Statement — recommended evidence
Reference: Local Validation List, section 4, page 29; policy BE5.
Submission guidance: Residential and commercial applications — recommended, rather than required for validation.
Recommended evidence: Show how the site will provide infrastructure, including open-access ducting to industry standards, for fibre broadband. Section 4 expressly distinguishes these recommended documents from validation requirements, although the council may need them during assessment. Early submission can help avoid delays or additional conditions.
GTech support: GTech can assess available networks and prepare proportionate connectivity evidence for the proposed development.
Council list, recommended documents on page 29 →
Entry reviewed 17 October 2026.
Bristol: Broadband Connectivity AssessmentPublished local list — September 2024All major development.Assessment requirements and source
Published local list — September 2024
Bristol: Broadband Connectivity Assessment
Reference: Local List, item 16b; printed pages 9 and 20–21.
Submission trigger: All major development.
Required evidence: Provide evidence from broadband infrastructure providers showing the connectivity available at the site and how occupiers will connect. Where suitable service is unavailable, document provider discussions and proposals for an upgrade; where no provider agrees to deliver it, explain the provision of dedicated ducting for a future connection.
GTech support: GTech can assess available networks, identify delivery constraints and prepare the supporting connectivity evidence.
Council local list, item 16b →
Entry reviewed 17 October 2026.
Bury: Digital Connectivity StatementApproved validation criteria — 24 March 2026New buildings and changes of use, covering both minor and major development.Assessment requirements and source
Approved validation criteria — 24 March 2026
Bury: Digital Connectivity Statement
Reference: March 2026 Checklist Criteria, item 31; committee approval recorded under PCC.8.
Submission trigger: New buildings and changes of use, covering both minor and major development.
Required evidence: Explain how the proposal responds to Places for Everyone policy JP-C2 and relevant local-plan or supplementary guidance. The March 2026 review combines the council’s local and Places for Everyone checklists.
GTech support: GTech can assess connectivity options and prepare evidence addressing the applicable digital-infrastructure requirements.
March 2026 criteria, item 31 → · Committee decision, PCC.8 →
Entry reviewed 17 October 2026.
Croydon: TV, mobile and radio reception impact assessmentPublished local validation list — May 2026Tall-building proposals, applying the council’s definition and the relevant development-plan context.Assessment requirements and source
Published local validation list — May 2026
Croydon: TV, mobile and radio reception impact assessment
Reference: Development Type table, TV/Radio Reception Impact Assessment, printed page 29.
Submission trigger: Tall-building proposals, applying the council’s definition and the relevant development-plan context.
Required evidence: Assess effects on television, mobile-phone services including 5G, and radio reception. The submission should record consultation with relevant providers and explain mitigation for identified effects. This is an impact-assessment requirement, distinct from providing broadband to the new development.
GTech support: GTech can scope reception surveys, model interference and support provider consultation and mitigation.
May 2026 validation list → · Council submission guidance →
Entry reviewed 17 October 2026.
Rugby Borough: Broadband StatementPublished council validation checklist — February 2024 fileAll major development proposals.Assessment requirements and source
Published council validation checklist — February 2024 file
Rugby Borough: Broadband Statement
Reference: Validation Checklist, item 6.7, PDF page 37; policy basis SDC9, Rugby Borough Local Plan 2019.
Submission trigger: All major development proposals.
Required evidence: Explain how the development will support broadband infrastructure and secure suitable service levels for its users. The council’s application guidance directs applicants to the Validation and Sustainability Checklists.
GTech support: GTech can review nearby infrastructure, assess connection options and prepare a proportionate Broadband Statement. Assess interference with existing networks separately where the proposal could affect them.
Council checklist, item 6.7 → · Council checklist publication page →
Entry reviewed 17 October 2026.
Stratford-on-Avon: Connectivity StatementPublished updated Local List — July 2026All new major developments.Assessment requirements and source
Published updated Local List — July 2026
Stratford-on-Avon: Connectivity Statement
Reference: Planning Application Local List, Connectivity Statement, policy CS.26; printed page 9.
Submission trigger: All new major developments.
Required evidence: Describe the project’s connectivity needs, nearby data networks and expected speeds, and how it will connect to or support those networks. The checklist covers fibre and other high-speed broadband infrastructure, including relevant fixed and wireless options.
GTech support: GTech can examine network availability, assess practical connection arrangements and prepare the submission evidence.
July 2026 Local List → · Council update and publication page →
Entry reviewed 17 October 2026.
Trafford: Digital Connectivity StatementJanuary 2025 checklist requirement — latest council copy awaiting recheckNew buildings, minor and major, residential and non-residential, and changes of use.Assessment requirements and source
January 2025 checklist requirement — latest council copy awaiting recheck
Trafford: Digital Connectivity Statement
Reference: Application Validation Checklist, adopted January 2025; Digital Connectivity Statement.
Submission trigger: New buildings, minor and major, residential and non-residential, and changes of use.
Required evidence: Explain provision of full-fibre connections, or substantiate technical or viability constraints. Address suitable ducting and arrangements to make connections available when the development is occupied.
Verification note: The requirement is corroborated by published application evidence and the council’s consultation text. The latest adopted council PDF could not be rechecked on 17 October 2026; confirm the operative checklist before submission. The consultation PDF linked below is historical, not the adopted checklist.
Council checklist download — confirm latest version → · Historical council consultation text →
Entry reviewed 17 October 2026.
Belfast: tall buildings and broadcast servicesAdopted local policy / supplementary guidanceDeveloper responsibility: Demonstrate no unacceptable interference with telecoms, TV or radio transmission networks.Assessment requirements and source
Adopted local policy / supplementary guidance
Belfast: tall buildings and broadcast services
Reference: DES3 criterion (h)/(8); Tall Buildings SPG 5.8.2 and 6.1.1
Developer responsibility: Demonstrate no unacceptable interference with telecoms, TV or radio transmission networks. The SPG calls for wireless-service effects to be considered early and assessed before development, so mitigation can be addressed at planning stage; Ofcom consultation may be relevant. Applications meeting the DES3 trigger also require a Tall Building Design Statement explaining compliance with the policy criteria.
Addresses unacceptable interference with telecommunications, television and radio networks, alongside aviation requirements. Belfast’s definition includes 35m AOD or buildings significantly higher than their surroundings.
For your development: Do not confuse AOD with height above ground; undertake relevant wireless-service studies during design.
Belfast: telecommunicationsAdopted local development plan and validation guidanceBelfast adopted its Plan Strategy in May 2023.Assessment requirements and source
Adopted local development plan and validation guidance
Belfast: telecommunications
Reference: Plan Strategy ITU1; supporting-statement checklist
Belfast adopted its Plan Strategy in May 2023. ITU1 covers telecoms development; the 2025 checklist calls for a supporting statement addressing its criteria, including technical justification and mast-sharing investigation.
For your development: For masts, antennas and base stations: supply the required statement.
Birmingham Local Plan: Publication Plan 2026Emerging local plan; consultation closedConsultation ran 13 August–24 September 2026; examination is expected in 2027.Assessment requirements and source
Emerging local plan; consultation closed
Birmingham Local Plan: Publication Plan 2026
Reference: Plan to 2044
Consultation ran 13 August–24 September 2026; examination is expected in 2027. It has not replaced adopted policy.
For your development: Check the emerging tall-building, infrastructure and renewable-energy provisions and subsequent modifications for the site.
Birmingham: application informationPublished local information requirementsThe Council’s published requirements identify technical justification and consultation information for mast, antenna and kiosk proposals.Assessment requirements and source
Published local information requirements
Birmingham: application information
Reference: Telecommunications and tall-building supporting information
The Council’s published requirements identify technical justification and consultation information for mast, antenna and kiosk proposals. Older references within a checklist do not replace current policy.
For your development: Confirm the latest checklist and provide proportionate technical evidence.
Birmingham: design and tall buildingsAdopted supplementary planning documentThe contemporary design guidance should lead the page’s Birmingham entry.Assessment requirements and source
Adopted supplementary planning document
Birmingham: design and tall buildings
Reference: Birmingham Design Guide, adopted 6 September 2022
The contemporary design guidance should lead the page’s Birmingham entry. The 2003 High Places document and a 2016 press report should not be used as the principal current-policy source.
For your development: Review the Design Guide’s tall-building requirements, current development plan and airport/NATS consultation needs.
Brent BD2: protecting telecommunications from tall buildingsAdopted local development plan — 24 February 2022Trigger: BD2 addresses tall buildings, defined locally as more than 30m above ground level.Assessment requirements and source
Adopted local development plan — 24 February 2022
Brent BD2: protecting telecommunications from tall buildings
Reference: Brent Local Plan 2019–2041, BD2 and supporting paragraph 6.1.19(b)
Trigger: BD2 addresses tall buildings, defined locally as more than 30m above ground level. The separate validation checklist also captures proposals significantly taller than their surroundings.
Developer responsibility: The functional-impact explanation requires no adverse effect on telecommunications, alongside aviation, navigation and solar energy generation. A development’s own broadband provision does not answer the question of effects on existing networks.
GTech assessment approach: Consider microwave paths, mobile installations and broadcast reception as relevant; document construction effects, operator liaison and mitigation. Read BD2 with London Plan D9 and SI6, and submit the required reception assessment when the validation trigger is met.
Brent: TV/radio reception assessmentsPublished validation requirementCalls for a TV/Radio Reception Assessment for buildings 30m high or taller, or proposals significantly taller than their surroundings.Assessment requirements and source
Published validation requirement
Brent: TV/radio reception assessments
Reference: Full/outline/technical-details consent checklist
Calls for a TV/Radio Reception Assessment for buildings 30m high or taller, or proposals significantly taller than their surroundings.
For your development: Provide the assessment at submission where triggered; consider both existing reception and proposed mitigation.
Burnley CC3: television, broadband, telecommunications and radarAdopted local development plan — July 2018Trigger: Wind-energy development.Assessment requirements and source
Adopted local development plan — July 2018
Burnley CC3: television, broadband, telecommunications and radar
Reference: CC3(1)(f) and (g), Wind Energy Development
Trigger: Wind-energy development.
Developer responsibility: Criterion (g) requires no unacceptable effect on television or broadband reception or other telecommunications. Criterion (f) separately protects commercial and military aircraft radar and the safeguarded Met Office site at Hameldon Hill.
GTech assessment approach: Address broadcast reception, relevant fixed links and mobile networks separately from aviation and weather radar. Explain the assessed turbine envelope, receptors, consultation, mitigation and remaining effects.
Policy currency: These are the adopted local interference criteria. Older surrounding explanatory references to national wind-policy restrictions must be read against the current NPPF; they are not repeated here as current national requirements.
City of London: City Plan 2040Emerging local plan under examinationThe plan remains in the examination/adoption process at the review date; official September 2026 updates anticipate adoption by year-end.Assessment requirements and source
Emerging local plan under examination
City of London: City Plan 2040
Reference: Examination documents and modifications
The plan remains in the examination/adoption process at the review date; official September 2026 updates anticipate adoption by year-end.
For your development: Review current and proposed tall-building and infrastructure policy, taking account of modifications. Do not describe anticipated adoption as completed.
Clean energy and electricity networksCurrent national policyW1 and W2 address infrastructure planning and renewable-energy opportunities.Assessment requirements and source
Current national policy
Clean energy and electricity networks
Reference: W1, W2 and W3
W1 and W2 address infrastructure planning and renewable-energy opportunities. W3 gives substantial weight to renewable and low-carbon energy benefits, including repowering and life extension. Technical impacts still need assessment against applicable policies.
For your development: For wind, solar, storage and grid projects: set out benefits and resolve relevant communications and safeguarding constraints early.
CO1: telecommunications infrastructureCurrent national policySupports network coverage, capacity, reliability and resilience; favours use or upgrading of existing sites where reasonable.Assessment requirements and source
Current national policy
CO1: telecommunications infrastructure
Reference: CO1(1)(a)–(d) and CO1(2)
Supports network coverage, capacity, reliability and resilience; favours use or upgrading of existing sites where reasonable. Requires careful siting, ICNIRP compliance and avoidance of significant, irremediable interference with electrical equipment, air traffic services or nationally important instrumentation. It does not establish a blanket separation distance.
For your development: For masts, rooftop installations and network upgrades: demonstrate site selection, technical constraints and interference compatibility.
CO2: supporting informationCurrent national policySets out relevant consultation, alternative-site evidence and evidence of compliance with CO1 radiation and interference provisions, including prior-approval proposals.Assessment requirements and source
Current national policy
CO2: supporting information
Reference: CO2(1)(a)–(c)
Sets out relevant consultation, alternative-site evidence and evidence of compliance with CO1 radiation and interference provisions, including prior-approval proposals.
For your development: Provide a proportionate supporting statement, consultation record and relevant technical evidence.
Digital Connectivity Infrastructure London Plan GuidancePublished implementation guidanceExplains connectivity provision, avoidance of interference with existing infrastructure and integration into the public realm.Assessment requirements and source
Published implementation guidance
Digital Connectivity Infrastructure London Plan Guidance
Reference: Published guidance supporting SI6
Explains connectivity provision, avoidance of interference with existing infrastructure and integration into the public realm. Read alongside Part R where building-regulation requirements apply.
For your development: Identify affected network assets and engage with providers early; document service continuity and mitigation.
Digital telecommunications planning guidancePublished national guidanceExplains planning procedures, collaboration and siting/design considerations.Assessment requirements and source
Published national guidance
Digital telecommunications planning guidance
Reference: 20 December 2023
Explains planning procedures, collaboration and siting/design considerations. It replaces PAN 62: Radio Telecommunications.
For your development: Use the 2023 guidance for telecoms applications and early discussions with planning authorities.
Draft London Plan 2026: tall buildingsEmerging strategic plan; consultation closed 15 October 2026Trigger: The development-management criteria apply to proposals 30m and above, approximately ten storeys and above, in all locations.Assessment requirements and source
Emerging strategic plan; consultation closed 15 October 2026
Draft London Plan 2026: tall buildings
Reference: MBUL3(B)(4)(viii)–(ix)
Trigger: The development-management criteria apply to proposals 30m and above, approximately ten storeys and above, in all locations. This is distinct from the adopted D9 definition and MBUL4’s separate engagement provisions.
Developer responsibility proposed: The building, including during construction, should not interfere with telecommunications, aviation or navigation. Adjoining solar generation has a separate criterion.
GTech assessment approach: Assess the proposed massing, rooftop structures and temporary construction envelope against affected networks; identify operators and demonstrate avoidance or mitigation. Record compliance with adopted policies separately from the draft, whose weight depends on its stage, objections and consistency with national policy.
For development 30m and above, proposes protection of aviation, navigation and telecommunications during construction as well as operation, and protection of adjoining solar generation.
For your development: Review the building envelope, rooftop equipment and construction programme against both adopted D9 and the draft.
Draft London Plan 2026: utilities and continuityEmerging strategic planDeveloper responsibility proposed: Consider line-of-sight impacts on nearby rooftop mobile masts for tall buildings over 30m, the positioning and fabric of buildings, and continuity of service, including signal…Assessment requirements and source
Emerging strategic plan
Draft London Plan 2026: utilities and continuity
Reference: MBUL4; Digital specifications; paragraphs 2.60–2.67; Table 2.3
Developer responsibility proposed: Consider line-of-sight impacts on nearby rooftop mobile masts for tall buildings over 30m, the positioning and fabric of buildings, and continuity of service, including signal quality, where existing infrastructure is incorporated.
Separate engagement trigger: Table 2.3 identifies referable development or development otherwise affecting existing fixed digital infrastructure, including schemes over 18m, for engagement with mobile operators through dedicated inboxes. Do not substitute the 30m tall-building threshold for this engagement provision.
Whole-system approach: Paragraph 2.60 addresses connectivity deficiencies and fibre routing through and beyond a site. Ducting, access, masts and boosting measures should be considered together. This is emerging policy, not an adopted requirement.
Proposes integrated utilities planning, connectivity and resilience. Digital specifications identify line-of-sight interference assessment for nearby rooftop mobile masts for tall buildings over 30m. Paragraph 2.66 expects arrangements for service continuity before Notices to Quit are issued, through construction and beyond, in dialogue with providers.
For your development: Assess obstruction of neighbouring sites and relocation of on-site apparatus. Consultation ran from 16 July to 15 October 2026 and closed at 5pm.
Draft London Plan MBUL6: coordinated digital infrastructureEmerging strategic plan — Draft London Plan, 16 July 2026Scope: All local plans and development proposals; no tall-building height threshold applies to the policy as a whole.Assessment requirements and source
Emerging strategic plan — Draft London Plan, 16 July 2026
Draft London Plan MBUL6: coordinated digital infrastructure
Reference: MBUL6 C(1)–(3), High quality design for a growing, changing city
Scope: All local plans and development proposals; no tall-building height threshold applies to the policy as a whole.
Developer responsibility proposed: Infrastructure should combine functions and security with mitigation of potential adverse amenity and surrounding-area effects. Digital infrastructure should include ducting and access supporting future connections, maintenance and updating. Installation should follow a coordinated dig-once approach during construction.
Relationship to interference: This supports integrated delivery and mitigation; MBUL3 and MBUL4 provide the more specific tall-building interference, engagement and service-continuity provisions. MBUL6 should not be presented as a standalone universal requirement for a microwave-link study.
East Riding EC5: energy development affecting telecommunicationsAdopted local development plan — Local Plan Update 2025Trigger: Energy-sector development within EC5’s scope and its associated infrastructure.Assessment requirements and source
Adopted local development plan — Local Plan Update 2025
East Riding EC5: energy development affecting telecommunications
Reference: EC5 A(3)(iv); supporting paragraphs 6.83–6.84
Trigger: Energy-sector development within EC5’s scope and its associated infrastructure.
Developer responsibility: Address effects on telecommunications and other networks, electromagnetic production and interference, and aeronautical systems including radar. Significant adverse impacts must be satisfactorily addressed and the residual harm weighed against wider benefits.
GTech assessment approach: Identify radio, TV, telecoms and emergency-service receptors; assess physical and electromagnetic effects and relevant cumulative development; consult the affected operators and safeguarding bodies; and set out mitigation. The supporting explanation discusses wind-turbine interference and relevant consultation. Do not rely on the policy’s general support for energy development as evidence that network impacts are acceptable.
Electronic Communications CodeLand-rights frameworkRegulates rights relating to installation and maintenance of communications apparatus on land.Assessment requirements and source
Land-rights framework
Electronic Communications Code
Reference: Ofcom overview of rights and obligations
Regulates rights relating to installation and maintenance of communications apparatus on land. It has a different role from planning consent.
For your development: Where redevelopment affects rooftop equipment, coordinate relocation/service continuity with providers and obtain appropriate land-rights advice.
EN-1: overarching energy policyDesignated National Policy StatementApplicant assessment: Where energy infrastructure may affect civil or military CNS, weather radar or other defence assets, set out potential effects in the Environmental Statement.Assessment requirements and source
Designated National Policy Statement
EN-1: overarching energy policy
Reference: Section 5.5, especially 5.5.38–45 and 5.5.51–63
Applicant assessment: Where energy infrastructure may affect civil or military CNS, weather radar or other defence assets, set out potential effects in the Environmental Statement. Consult the MOD, Met Office, CAA, NATS and affected aerodromes as relevant; consider cumulative effects and electrical or electromagnetic interference near CNS infrastructure.
Applicant action: Include mitigation within the development and inform consultees promptly of relevant proposal changes. Decision-making considers whether impacts have been addressed and realistic mitigation secured.
Scope: Use EN-1 for the consent routes and infrastructure covered by the NPS framework, or as a material consideration where appropriate. Its CNS provisions should not be described as a universal commercial microwave-link assessment rule.
Addresses aviation, defence and communications, navigation and surveillance systems. Wind turbines can affect radar and navigation equipment; electrical noise from energy infrastructure can also affect defence systems. Future radar improvements should not simply be assumed to solve a project’s impacts.
For your development: Screen airport, NATS, MOD and other technical interests; agree assessment scope and workable mitigation.
EN-3: renewable-energy infrastructureDesignated National Policy StatementAdds renewable-technology requirements to EN-1.Assessment requirements and source
Designated National Policy Statement
EN-3: renewable-energy infrastructure
Reference: Technology-specific assessment; offshore wind 2.8.167–173
Adds renewable-technology requirements to EN-1. Offshore wind may interact with existing telecommunications infrastructure and other sea users; early engagement and assessment of effects through the project lifecycle are important.
For your development: Include relevant offshore assets and shore connections in consultation and assessment. For solar, assess relevant glint/glare separately from radio-frequency interference.
EN-5: electricity networksDesignated National Policy StatementApplies with EN-1 to relevant electricity-network infrastructure, including substations and associated works.Assessment requirements and source
Designated National Policy Statement
EN-5: electricity networks
Reference: Sections 1.4, 2.1 and electric/magnetic-field provisions
Applies with EN-1 to relevant electricity-network infrastructure, including substations and associated works. Its electric and magnetic field provisions concern a different issue from reception interference or physical obstruction of a microwave link.
For your development: Keep EMF compliance, electromagnetic compatibility and radio-link obstruction as separate assessment topics.
England: digital-infrastructure planning reformReform watchlist; closed call for evidenceConsidered targeted changes to permitted-development rules and guidance for fixed and mobile infrastructure.Assessment requirements and source
Reform watchlist; closed call for evidence
England: digital-infrastructure planning reform
Reference: Issued 18 December 2025; closed 26 February 2026
Considered targeted changes to permitted-development rules and guidance for fixed and mobile infrastructure. Consultation proposals are not themselves permission or operative rules.
For your development: Check for enacted changes before relying on proposed mast, rooftop or small-cell allowances.
Eskdalemuir: further wind-interference reformsReform watchlist; closed consultationConsultation closed 5 August 2026.Assessment requirements and source
Reform watchlist; closed consultation
Eskdalemuir: further wind-interference reforms
Reference: 2026 proposals for legislation, planning guidance and algorithms
Consultation closed 5 August 2026. Proposed further changes should be distinguished from MOD’s safeguarding approach adopted with effect from 18 March 2026. This is seismic interference, a related wind constraint rather than telecoms interference.
For your development: For affected wind proposals: confirm the operative MOD approach and accepted calculation method.
Future Wales: digital communicationsAdopted national development planSupports digital communications and gigabit-capable connectivity within Wales’ national spatial framework.Assessment requirements and source
Adopted national development plan
Future Wales: digital communications
Reference: Policy 13: Supporting Digital Communications
Supports digital communications and gigabit-capable connectivity within Wales’ national spatial framework.
For your development: Assess digital provision alongside the applicable local development plan and infrastructure requirements.
Future Wales: renewable energyAdopted national development planSets the national approach to renewable and low-carbon energy.Assessment requirements and source
Adopted national development plan
Future Wales: renewable energy
Reference: Policies 17 and 18
Sets the national approach to renewable and low-carbon energy. Policy 18 includes an unacceptable-effects test encompassing electromagnetic disturbance.
For your development: For larger wind/solar proposals: identify communications receptors and evidence that relevant effects are acceptable or mitigated.
Greater Manchester Places for Everyone: JP-C2 Digital ConnectivityAdopted joint development plan — effective 21 March 2024Geographical coverage: Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Tameside, Trafford and Wigan.Assessment requirements and source
Adopted joint development plan — effective 21 March 2024
Greater Manchester Places for Everyone: JP-C2 Digital Connectivity
Geographical coverage: Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Tameside, Trafford and Wigan. Stockport is outside this joint plan.
Reference: Places for Everyone Joint Development Plan 2022–2039, policy JP-C2, printed pages 218–219.
Developer responsibility: New development is required to have full-fibre connections unless technically infeasible and/or unviable. Provide multiple ducting compliant with telecommunications standards to support future gigabit-capable connections. The policy expects connections to be operational and accessible to network providers when occupiers move in.
Further considerations: Support latest-generation mobile coverage while protecting townscape quality and accommodating technological change; facilitate free secure high-speed public Wi-Fi, particularly in busy areas.
Evidence: Demonstrate deliverable infrastructure or substantiate any claimed technical or viability exception. Check each council’s validation list separately: an adopted policy obligation and a mandatory submission document have different roles. GTech digital and broadband connectivity assessments can support this evidence.
Highland: onshore wind guidanceAdopted supplementary guidance; read with NPF4The Council lists this suite as part of its development plan.Assessment requirements and source
Adopted supplementary guidance; read with NPF4
Highland: onshore wind guidance
Reference: November 2016 guidance and December 2017 addendum
The Council lists this suite as part of its development plan. It supplies local wind-energy assessment context; newer national policy must also be considered.
For your development: Check the relevant Highland plan and guidance for the site. Do not substitute the former Highland Renewable Energy Strategy, which ceased being a material consideration in 2016.
London Plan: digital connectivityAdopted strategic development planDeveloper responsibility — existing services: A(3) requires proposals to avoid reducing mobile connectivity in surrounding areas; where avoidance is not possible, the reduction requires mitigation.Assessment requirements and source
Adopted strategic development plan
London Plan: digital connectivity
Reference: SI6 A(1)–(4) and B: Digital connectivity infrastructure
Developer responsibility — existing services: A(3) requires proposals to avoid reducing mobile connectivity in surrounding areas; where avoidance is not possible, the reduction requires mitigation. This is an off-site protection requirement, distinct from providing connectivity to the development itself.
Other requirements: A(1) addresses full-fibre ducting or an affordable alternative 1GB/s-capable connection for all end users; A(2) addresses mobile demand generated by the proposal; A(4) supports suitable rooftop and public-realm mobile infrastructure. Part B concerns development-plan support for full-fibre or equivalent infrastructure, especially connectivity gaps and digital-access barriers.
GTech assessment approach: Identify surrounding mobile services, examine obstruction and loss of coverage, consult affected operators and explain avoidance or workable mitigation. The policy does not prescribe one universal separation distance.
Addresses connectivity for new development, capacity and coverage, and protection of existing digital infrastructure. A development’s effect on services outside its own boundary can matter.
For your development: For residential, commercial and mixed-use schemes: consider fixed and mobile services, ducting, roof infrastructure and surrounding users.
London Plan: tall buildingsAdopted strategic development planTrigger: Local plans define tall buildings for their context.Assessment requirements and source
Adopted strategic development plan
London Plan: tall buildings
Reference: D9(A) and D9(C)(2)(f)
Trigger: Local plans define tall buildings for their context. D9(A) sets a minimum definition of six storeys or 18m, measured from ground to the floor level of the uppermost storey; this is not a universal 18m assessment trigger.
Developer responsibility: The functional-impact test covers telecommunications interference from both the building and its construction. Cranes and temporary structures therefore belong in the assessment alongside the final envelope. Aviation, navigation and adjoining solar generation are separate related tests.
GTech assessment approach: Examine affected paths and rooftop installations, construction stages, operator consultation and mitigation before the application is determined.
Requires buildings, including construction, to avoid interference with aviation, navigation and telecommunications, and significant detrimental effects on solar generation on adjoining buildings.
For your development: Assess the completed building, cranes and temporary works, with TV/radio, mobile and microwave studies where relevant.
Manchester Local Plan: Publication Draft 2026Emerging local plan; consultation closedConsultation closed 28 September 2026.Assessment requirements and source
Emerging local plan; consultation closed
Manchester Local Plan: Publication Draft 2026
Reference: Regulation 19 publication stage
Consultation closed 28 September 2026. The Council is reviewing representations before submission and examination. The draft is not yet the adopted replacement for the Core Strategy.
For your development: For Manchester schemes, review the latest proposed design, infrastructure and energy policies as well as existing requirements.
Manchester: tall buildingsAdopted Core Strategy pending replacementEN2 provides the local tall-building policy context.Assessment requirements and source
Adopted Core Strategy pending replacement
Manchester: tall buildings
Reference: Core Strategy EN2; related development-management policies
EN2 provides the local tall-building policy context. The emerging Local Plan has not yet replaced the Core Strategy at the review date.
For your development: Combine the policy review with reception, communications and airport/NATS safeguarding assessment where relevant.
Manchester: television/radio reception evidencePublished application-validation checklistThe Council’s published checklist requests a report where development may interfere with TV/radio reception, and identifies supporting information for tall buildings.Assessment requirements and source
Published application-validation checklist
Manchester: television/radio reception evidence
Reference: Television Reception and Tall Buildings entries
The Council’s published checklist requests a report where development may interfere with TV/radio reception, and identifies supporting information for tall buildings. Some national-policy references in the document are old.
For your development: Confirm the current validation requirements for the actual application; scope baseline surveys, impact assessment and mitigation with the authority.
Merton: adopted plans and communications policyAdopted local plan — 20 November 2024Merton Local PlanRequirements, plan status and sources
Merton Local Plan
Adopted position: 20 November 2024.
Communications and development: D12.8: Digital infrastructure addresses telecommunications equipment, design and amenity. Use the adopted November 2024 plan rather than older Core Strategy or Sites and Policies wording.
Emerging-plan check: The new borough-wide plan has reached adoption. No separate replacement borough-wide draft verified in this review.
Official adopted-plan source · Council application information / validation source
Assessment scope: Read the borough provisions with the adopted London Plan D9 and SI6. Identify effects on existing services separately from connectivity provided within the scheme. A validation-source link alone does not establish a standalone assessment requirement.
London review: 17 October 2026.
Mobile phone network development for WalesPublished supporting guidanceCovers engagement and good practice in developing mobile infrastructure.Assessment requirements and source
Published supporting guidance
Mobile phone network development for Wales
Reference: 2021 Code of Best Practice
Covers engagement and good practice in developing mobile infrastructure. Its historical references to TAN 19 must be read in light of TAN 19’s revocation.
For your development: Support network proposals with consultation, siting and design evidence.
National Planning Policy Framework 2026Current national policyThe current Framework replaces December 2024.Assessment requirements and source
Current national policy
National Planning Policy Framework 2026
Reference: Published 17 August 2026; accessible version 29 September 2026
The current Framework replaces December 2024. Communications provisions now use policy codes CO1 and CO2 in Chapter 9, rather than the former Chapter 10 paragraph numbering.
For your development: Use current references in planning statements and assessment reports.
NPF4: digital infrastructureAdopted national development-plan policySupports appropriate digital infrastructure and improved connectivity.Assessment requirements and source
Adopted national development-plan policy
NPF4: digital infrastructure
Reference: Policy 24(a)–(e), especially 24(e)(iii)
Supports appropriate digital infrastructure and improved connectivity. Addresses siting, visual impacts and alternatives to new masts; proposals must not physically obstruct aerodrome operations, technical sites or existing transmitter/receiver facilities.
For your development: For telecoms proposals: explain technical constraints and demonstrate compatibility with safeguarded facilities.
NPF4: energy and interferenceAdopted national development-plan policyDeveloper responsibility: Design and mitigation for energy proposals must demonstrate how telecoms and broadcasting effects are addressed, with particular protection of transmission links under (v).Assessment requirements and source
Adopted national development-plan policy
NPF4: energy and interference
Reference: Policy 11(e)(iv), (v) and (xiii)
Developer responsibility: Design and mitigation for energy proposals must demonstrate how telecoms and broadcasting effects are addressed, with particular protection of transmission links under (v). Aviation and defence interests fall under (iv); cumulative impacts under (xiii).
GTech assessment approach: Identify affected installations and links, assess the project envelope and relevant cumulative schemes, and demonstrate avoidance or workable mitigation. For turbines, assess blades as well as tower locations. This direct energy-development test is distinct from NPF4 Policy 24’s criteria for new digital infrastructure.
Energy-project design and mitigation must address aviation and defence interests, telecommunications and broadcasting installations, protection of transmission links, and cumulative impacts.
For your development: For wind farms and other energy developments: assess link and broadcast effects, consult affected interests and document mitigation.
NPF4: infrastructure first and health/safetyAdopted national development-plan policyProvides related infrastructure and safety context.Assessment requirements and source
Adopted national development-plan policy
NPF4: infrastructure first and health/safety
Reference: Policies 18 and 23
Provides related infrastructure and safety context. These policies should be read with the specific requirements of Policies 11 and 24 rather than treated as independent universal telecoms-assessment triggers.
For your development: Identify the applicable local development plan and any site-specific safeguards.
NPPF implementation and transitionCurrent national policyThe new Framework applies to decision-making, while some plans remain subject to December 2024 plan-making provisions through transitional arrangements.Assessment requirements and source
Current national policy
NPPF implementation and transition
Reference: Annex A, particularly paragraphs 1–8
The new Framework applies to decision-making, while some plans remain subject to December 2024 plan-making provisions through transitional arrangements. Older adopted local policies are not automatically discarded because of their age.
For your development: Identify whether a reference concerns a planning decision or preparation of a particular plan; do not delete historic versions needed to explain a transition.
P1: protecting existing activities in plan-makingCurrent national policyDevelopment plans should avoid unreasonable restrictions on existing operations and reflect relevant safeguarding areas.Assessment requirements and source
Current national policy
P1: protecting existing activities in plan-making
Reference: NPPF 2026, P1(1)(a)(iv) and (c)
Development plans should avoid unreasonable restrictions on existing operations and reflect relevant safeguarding areas.
P4: development affecting existing communications networksCurrent national policyTrigger: New construction or changes of use affecting an established activity; P4(3) expressly includes interference with electronic communications networks.Assessment requirements and source
Current national policy
P4: development affecting existing communications networks
Reference: NPPF 2026, Chapter 17, P4(1)–(3)
Trigger: New construction or changes of use affecting an established activity; P4(3) expressly includes interference with electronic communications networks. Both lawful current and permitted operation matter.
Developer responsibility: P4(1) protects existing activities from unreasonable restrictions resulting from later development and expects effective integration with surrounding activities and infrastructure.
Read the direction of impact carefully: P4(2) specifically addresses significant adverse effects from an existing activity on new development, with early discussion, mitigation before occupation and securing measures by conditions or obligations. P4(3) extends the policy’s application to new-development interference with networks; it should not be reduced to a noise policy.
GTech assessment approach: Identify established services and their permitted operation, test the relevant interference mechanism and demonstrate a practical avoidance or mitigation strategy supported by operator engagement.
P4 protects existing activities against unreasonable operational restrictions from later development. P4(3) expressly covers electronic communications networks, new construction and changes of use, taking account of lawful current and permitted operation. This is a direct policy basis for assessing a building, turbine or redevelopment affecting an existing network; CO1/CO2 address telecoms infrastructure proposals. Identify affected operations, consult operators and assess interference and mitigation. P4(2) separately addresses existing activities adversely affecting a proposed development, including mitigation before occupation.
P5: public safety and safeguarded facilitiesCurrent national policyDevelopment in relevant safeguarded areas requires consultation, safety and avoidance of operational constraints on protected facilities.Assessment requirements and source
Current national policy
P5: public safety and safeguarded facilities
Reference: NPPF 2026, P5(1)(d)
Development in relevant safeguarded areas requires consultation, safety and avoidance of operational constraints on protected facilities.
P6: defence and public-safety infrastructureCurrent national policyGives substantial weight to defence and public-safety infrastructure, including emergency-services telecoms, and addresses development affecting its operation.Assessment requirements and source
Current national policy
P6: defence and public-safety infrastructure
Reference: NPPF 2026, P6(1)
Gives substantial weight to defence and public-safety infrastructure, including emergency-services telecoms, and addresses development affecting its operation.
Planning Policy Wales: digital connectivityCurrent national policySets the national approach to electronic communications, siting and infrastructure provision.Assessment requirements and source
Current national policy
Planning Policy Wales: digital connectivity
Reference: Edition 12, Chapter 5, section 5.2
Sets the national approach to electronic communications, siting and infrastructure provision. Read the current document rather than archived TAN 19.
For your development: For buildings and telecoms schemes: incorporate connectivity and compatible infrastructure from the design stage.
Planning Policy Wales: reception and interferenceCurrent national policyTrigger and protection: Large or prominent buildings and other structures, including turbines, can obstruct or reflect telecoms and broadcast signals.Assessment requirements and source
Current national policy
Planning Policy Wales: reception and interference
Reference: Edition 12, paragraph 5.2.20, Reception and Interference
Trigger and protection: Large or prominent buildings and other structures, including turbines, can obstruct or reflect telecoms and broadcast signals. Interference can be a material planning consideration.
Onus in decision-making: The planning authority should be satisfied that siting and design have considered interference, recognising that correction after construction can be difficult. Consultation with telecoms or broadcast bodies may be appropriate.
GTech assessment approach: Provide proportionate evidence of affected services, siting alternatives, reception or link effects and achievable mitigation at application stage. The paragraph does not impose a single height or separation threshold.
Recognises that large or prominent buildings and structures, including turbines, can obstruct or reflect signals and interfere with telecommunications and broadcasting. Potential effects need consideration during siting and design.
For your development: For tall buildings and wind farms: assess TV/radio reception, relevant wireless services and mitigation before the layout is fixed.
Renewable and low-carbon energy: technical planning guidancePublished guidance; some passages outdatedIdentifies radio, television and phone-signal interference from turbines and describes operators’ typical 100m clearance requests either side of line-of-sight links, measured from swept blades.Assessment requirements and source
Published guidance; some passages outdated
Renewable and low-carbon energy: technical planning guidance
Reference: PPG paragraph 017; reference 5-017-20140306
Identifies radio, television and phone-signal interference from turbines and describes operators’ typical 100m clearance requests either side of line-of-sight links, measured from swept blades. This is technical guidance, not a universal statutory exclusion zone. Other passages on wind-policy restrictions and consent thresholds pre-date subsequent changes.
For your development: Use link-specific modelling and current operator requirements. Do not use the old blanket wind restrictions or historic thresholds as current policy.
Retained PPS10: limited transitional relevanceTransitional policy onlyTEL2 is cancelled.Assessment requirements and source
Transitional policy only
Retained PPS10: limited transitional relevance
Reference: SPPS paragraphs 1.9–1.11
TEL2 is cancelled. Other retained PPS10 provisions cease to apply in a district when its Plan Strategy is adopted; conflicts favour the SPPS.
For your development: Check council adoption status before citing retained policy.
Salford DG1: fibre provision and interference from telecommunications developmentAdopted local development plan — 18 January 2023New development: Enable enhancement of Salford’s digital infrastructure and incorporate full-fibre connections, with ducting that can accommodate more than one infrastructure provider.Assessment requirements and source
Adopted local development plan — 18 January 2023
Salford DG1: fibre provision and interference from telecommunications development
Reference: Salford Local Plan: Development Management Policies and Designations, DG1, printed pages 150–151.
New development: Enable enhancement of Salford’s digital infrastructure and incorporate full-fibre connections, with ducting that can accommodate more than one infrastructure provider.
Telecommunications development: DG1(H) requires proposals to avoid interference with other electrical equipment, air-traffic services and instrumentation operated in the national interest. DG1 also addresses sharing existing sites, siting, visual effects, radiation guidelines and pre-application consultation.
How the policies work together: DG1 governs provision and telecommunications proposals; DG2, detailed in the local-policy section below, protects existing infrastructure from other development, including microwave links and television reception. Renewable-energy proposals also need the EG2 checks listed below. A connectivity statement alone does not demonstrate compliance with interference-protection duties.
Salford DG2: protecting existing digital infrastructureAdopted local development planDeveloper responsibility: Avoid adverse effects on the successful functioning of existing digital infrastructure.Assessment requirements and source
Adopted local development plan
Salford DG2: protecting existing digital infrastructure
Reference: Adopted Local Plan, 18 January 2023; DG2 and paragraph 16.4, pages 151–152
Developer responsibility: Avoid adverse effects on the successful functioning of existing digital infrastructure. If avoidance is not practicable, provide appropriate mitigation.
Systems covered: Paragraph 16.4 identifies existing telecommunications apparatus, microwave links and switching stations, and the importance of preserving strong, uninterrupted television reception.
GTech assessment approach: Explain which networks and reception services could be affected, why effects can be avoided or why mitigation is necessary, and how the solution would be delivered with the relevant operator. This is a direct protection policy, distinct from DG1’s requirements for supplying new digital infrastructure.
Source check: The DG2 protection test above has been checked against the adopted January 2023 PDF, rather than relying on the archived January 2020 publication-stage webpage. Use the adopted plan and subsequent relevant strategic policies for the application.
Read adopted DG2, pages 151–152
For your development: Read the adopted plan’s digital chapter and relevant site designations alongside Places for Everyone where applicable.
Salford EG2: wind-energy telecommunications testAdopted local development plan — 18 January 2023Developer responsibility: Wind proposals must demonstrate no unacceptable amenity or safety effect involving radar or telecommunications.Assessment requirements and source
Adopted local development plan — 18 January 2023
Salford EG2: wind-energy telecommunications test
Reference: EG2, Wind criterion (3); paragraph 17.6
Developer responsibility: Wind proposals must demonstrate no unacceptable amenity or safety effect involving radar or telecommunications. Apply this alongside DG2’s existing-network protection test.
GTech assessment approach: Explain the turbine envelope, affected services and avoidance or mitigation. Check current national policy when reading older surrounding wind-policy explanations.
Significant Infrastructure ProjectsCurrent consenting framework; not a standalone telecoms policyThe SIP system replaced DNS from 15 December 2025, subject to transitional provisions.Assessment requirements and source
Current consenting framework; not a standalone telecoms policy
Significant Infrastructure Projects
Reference: Infrastructure (Wales) Act 2024 and SIP guidance
The SIP system replaced DNS from 15 December 2025, subject to transitional provisions. Older projects can follow different arrangements.
For your development: Confirm the project’s consent route with PEDW; apply the relevant national policy and appropriate interference evidence.
Southend draft DM7.3: telecommunications interference from tall buildingsPublished emerging local policy — Preferred Approach with Options 2025; not adoptedDeveloper responsibility proposed: Tall and large buildings must demonstrate that their surroundings would not suffer adverse effects from telecommunications interference, alongside other environmental and…Assessment requirements and source
Published emerging local policy — Preferred Approach with Options 2025; not adopted
Southend draft DM7.3: telecommunications interference from tall buildings
Reference: Draft DM7.3(2)(ii), Preferred Approach with Options document
Developer responsibility proposed: Tall and large buildings must demonstrate that their surroundings would not suffer adverse effects from telecommunications interference, alongside other environmental and design criteria. This is a direct interference test for new buildings rather than a policy simply promoting new telecoms equipment.
GTech assessment approach: Examine surrounding services during design and explain avoidance or mitigation.
Version and status: Consultation on this version closed 30 September 2025. A government Local Plan intervention letter was published in September 2026. Check the latest council publication before using the draft in an assessment; this entry does not describe the 2025 wording as an adopted policy or an open consultation.
SPPS: renewable and low-carbon energyCurrent regional policyScope: Renewable and low-carbon energy development, associated buildings and supporting infrastructure.Assessment requirements and source
Current regional policy
SPPS: renewable and low-carbon energy
Reference: SPPS Edition 2, December 2025, paragraphs 6.223–6.224
Scope: Renewable and low-carbon energy development, associated buildings and supporting infrastructure. Paragraph 6.223 sets the unacceptable-adverse-impact framework, including effects in combination with other developments; 6.224 expressly includes communications interference among the matters assessed according to technology, scale and local context.
GTech assessment approach: Assess affected services and cumulative interference where relevant; include ancillary structures and equipment; explain mitigation and residual effects. A positive renewable-energy principle does not remove these impact considerations. Apply the operative local development plan alongside the current SPPS.
Tests unacceptable effects, including aviation safety and communications interference, with project-specific and cumulative considerations.
For your development: For wind, solar and storage: identify relevant receptors and resolve technical concerns.
SPPS: telecommunications and other utilitiesCurrent regional policyAddresses radio-spectrum interference, site sharing, design, supporting evidence and ICNIRP compliance.Assessment requirements and source
Current regional policy
SPPS: telecommunications and other utilities
Reference: Edition 2, paragraphs 6.246–6.252
Addresses radio-spectrum interference, site sharing, design, supporting evidence and ICNIRP compliance.
For your development: For telecoms development: provide a technical statement and address affected spectrum users.
Tameside: Digital Connectivity Statement and JP-C2Current published local validation requirements — July 2025Submission trigger: The checklist expressly lists all telecommunications development and all new developments.Assessment requirements and source
Current published local validation requirements — July 2025
Tameside: Digital Connectivity Statement and JP-C2
Reference: Tameside Local Validation Requirements, July 2025, item 13, “Digital Connectivity Statement”.
Submission trigger: The checklist expressly lists all telecommunications development and all new developments.
Required evidence: Demonstrate how the proposal responds to affordable, high-quality digital infrastructure. The listed considerations are latest-generation mobile technology, full-fibre connections to premises, free secure high-speed public Wi-Fi and the relationship with proposed highway works.
Policy basis: The checklist cites Places for Everyone JP-C2 and NPPF chapter 10. Read its evidence requirement alongside the adopted JP-C2 policy and its technical-feasibility and viability qualifications.
Assessment implications: Explain the proposed infrastructure, delivery arrangements and relevant constraints. Where temporary or permanent works also obstruct or interfere with existing systems, include a separate impact assessment; the connectivity statement does not replace that evidence.
July 2025 checklist, item 13 → · Council validation-list publication →
Warrington: design guidancePublished supplementary guidanceThe Council currently lists both documents.Assessment requirements and source
Published supplementary guidance
Warrington: design guidance
Reference: Design Guide July 2024; Design and Construction listed as February 2016
The Council currently lists both documents. The older download filename says 2010, illustrating why filenames alone cannot establish status. Its specific telecoms wording should be checked against the current design guidance and Local Plan.
For your development: For tall schemes, verify the operative guidance with the authority; do not assume the previous page’s quoted interference wording remains unchanged.
Westminster Code of Construction Practice: electromagnetic interferenceCurrent construction code — March 2026Application: The council’s code covers basement and major development sites.Assessment requirements and source
Current construction code — March 2026
Westminster Code of Construction Practice: electromagnetic interference
Reference: General Site Operations, “Electromagnetic interference”, printed page 35 of the 2026 Code of Construction Practice.
Application: The council’s code covers basement and major development sites. The 2026 version applies to new sites from 1 June 2026 and existing sites from 1 September 2026; the applicable CMP/SEMP requirements depend on the site’s classification.
Developer responsibility: Assess potential interference with nearby wireless telecommunications systems. Where risks arise, use appropriate technology to minimise or eliminate radio-frequency interference. Investigate related adverse health concerns and mitigate or resolve interference caused by site activities wherever practicable.
Assessment implications: Construction plant, temporary works and site activities require consideration alongside the completed building. GTech can help scope affected systems, operator consultation and proportionate mitigation evidence for the construction-management submission. This is an explicit construction-stage protection requirement.
Westminster: building height and telecommunicationsLocal-policy implementation guidanceThe SPD identifies City Plan building-height policy and the requirement to avoid unacceptable aviation and telecoms effects.Assessment requirements and source
Local-policy implementation guidance
Westminster: building height and telecommunications
Reference: March 2026 Planning Obligations and Affordable Housing SPD, section 7.3
The SPD identifies City Plan building-height policy and the requirement to avoid unacceptable aviation and telecoms effects. It also explains mitigation in the planning-obligations context.
For your development: Use the current City Plan numbering rather than older validation-list references; address relevant effects in the technical submission.
Wireless network development Code of PracticePublished supporting guidanceGuides operators, authorities and stakeholders on consultation, siting, design and installation of wireless infrastructure.Assessment requirements and source
Published supporting guidance
Wireless network development Code of Practice
Reference: England, 7 March 2022
Guides operators, authorities and stakeholders on consultation, siting, design and installation of wireless infrastructure. Older NPPF paragraph references within the Code need to be read against the current Framework.
For your development: For telecoms applications: record engagement, explain alternatives and integrate equipment into the design.
Wirral: Digital Connectivity Statement for new dwellings and business premisesCurrent published local validation checklist — 2025Submission trigger: All applications proposing new dwellings or business premises, including both new-build development and conversions.Assessment requirements and source
Current published local validation checklist — 2025
Wirral: Digital Connectivity Statement for new dwellings and business premises
Reference: Wirral Local Validation Checklist, item 14. The document states adoption in May 2025 and is published as the council’s current checklist.
Submission trigger: All applications proposing new dwellings or business premises, including both new-build development and conversions.
Required evidence: A statement demonstrating how the development will have the infrastructure needed for high-quality communications. It should include ducting for full-fibre broadband, which the checklist identifies as the optimum solution in almost all cases.
Planning implications: Applicants should address network availability, connection arrangements and the proposed ducting within the submission. This is an application-evidence and connectivity-provision requirement. Where the scheme also affects an existing network or broadcast reception, assess that impact separately against the applicable protection policies.
GTech support: A proportionate digital or broadband connectivity assessment can identify delivery constraints and help avoid missing information at validation.
Current checklist, item 14 → · Council application guidance →
No matching entry is included in this register. Try another country, policy level or search term. This does not establish that no requirement applies; check the council’s current documents.
Guidance, coverage and supporting information
How to use this register
This register brings together current national policy across England, Scotland, Wales and Northern Ireland, London policy, selected local requirements and emerging plans. It covers tall buildings, wind farms, solar and battery schemes, telecoms infrastructure, TV/radio reception and continuity of digital services.
How to use this register
Adopted development plan: national, strategic or local plan policies with development-plan status in the relevant jurisdiction. Current national/regional policy: a policy framework with the role assigned to it by that planning system. Guidance: supporting advice, not automatically development-plan policy. Emerging: a draft or proposal whose status and weight must be assessed. Historical: superseded or cancelled material, included only to explain the update.
Policy summaries below are paraphrases. Follow the official links for the full wording and read documents as a whole. An old publication date does not by itself make a document obsolete. Assessment scope depends on the site, proposal, consent route and the services potentially affected.
Section notes and coverage
England — coverage and notes
England
National policy and guidance
Regional and strategic policy
Local policy, plans and construction guidance
Northern Ireland — coverage and notes
Northern Ireland
National policy and guidance
Northern Ireland-wide planning policy is described under regional policy below.
Regional and strategic policy
Local policy, plans and construction guidance
Scotland — coverage and notes
Scotland
National policy and guidance
Regional and strategic policy
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Local policy, plans and construction guidance
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Wales — coverage and notes
Wales
National policy and guidance
Regional and strategic policy
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Local policy, plans and construction guidance
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Council and borough validation checklists — coverage and notes
Council and borough validation checklists
Find the submission evidence requested by the council. These checklists are separate from the policies used to determine an application. Entries are grouped by country and alphabetically by council. This register contains selected published examples; it is not a completed review of every UK authority.
TV/radio interference: assess effects on existing reception. Digital/broadband connectivity: explain how the proposed development will obtain suitable connectivity. A connectivity statement does not replace an interference assessment.
England
Connectivity search coverage — 17 October 2026: Searches covered Digital Connectivity Statement, Digital Connectivity Assessment, Broadband Connectivity Assessment and Broadband Connectivity Statement, plus related council terminology. Council-name screening used the 317 entries in the government’s published England council directory. This is a search-led register, not a completed document-by-document audit of every current council checklist. Search engines may omit documents; an unlisted council may still require evidence. Read each entry’s trigger and status: recommended documents, consultation drafts and planning conditions are not automatically validation requirements.
| Council | Subject | Submission trigger / evidence | Details |
|---|---|---|---|
| Birmingham | Application information | Consult the council’s current list for the proposal and required supporting documents. | View requirement |
| Blackpool | full-fibre broadband statement | Major and minor non-residential proposals, excluding changes of use. | View requirement |
| Brent | TV / radio interference | Buildings 30m or taller, or significantly taller than their surroundings: TV/Radio Reception Assessment. | View requirement |
| Bristol | Broadband Connectivity Assessment | All major development. | View requirement |
| Bury | Digital Connectivity Statement | New buildings and changes of use, covering both minor and major development. | View requirement |
| Croydon | TV, mobile and radio reception impact assessment | Tall-building proposals, applying the council’s definition and the relevant development-plan context. | View requirement |
| Manchester | TV / radio interference | Reception report where development may interfere; check the Tall Buildings entry and current application requirements. | View requirement |
| Manchester | Broadband Connectivity Assessment | New-build residential development; confirm the evidence needed for the application. | View requirement |
| Milton Keynes | Digital Connectivity Statement | Proposals creating new commercial or residential premises, in the full and outline application sections. | View requirement |
| Newcastle upon Tyne | Digital Infrastructure Statement | Major planning applications, including residential and commercial development. | View requirement |
| Rugby Borough | Broadband Statement | All major development proposals. | View requirement |
| Stockton-on-Tees | Connectivity Statement (Broadband) | All new development, where appropriate; agree applicability with the council. | View requirement |
| Stratford-on-Avon | Connectivity Statement | All new major developments. | View requirement |
| Tameside | Digital / broadband connectivity | Item 13: all telecommunications development and all new developments; Digital Connectivity Statement. | View requirement |
| Trafford | Digital Connectivity Statement | New buildings, minor and major, residential and non-residential, and changes of use. Latest adopted council copy awaiting recheck. | View requirement |
| Warwick District | Connectivity Statement — recommended evidence | Residential and commercial applications — recommended, rather than required for validation. | View recommended evidence |
| Wirral | Digital / broadband connectivity | Item 14: new dwellings or business premises, including conversions; Digital Connectivity Statement. | View requirement |
Northern Ireland
Belfast’s telecommunications supporting-statement checklist is described with ITU1 in the local-policy entry. It concerns telecommunications installations and should not be treated as a general broadband or TV-reception checklist.
Scotland
No separate TV-reception or broadband validation-checklist entry is included here yet. Check the relevant council’s current requirements.
Wales
No separate TV-reception or broadband validation-checklist entry is included here yet. Check the relevant council’s current requirements.
England — renewable energy — coverage and notes
England — renewable energy
National policy and guidance
Regional and strategic policy
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Local policy, plans and construction guidance
Northern Ireland — renewable energy — coverage and notes
Northern Ireland — renewable energy
National policy and guidance
Northern Ireland-wide planning policy is described under regional policy below.
Regional and strategic policy
Local policy, plans and construction guidance
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Scotland — renewable energy — coverage and notes
Scotland — renewable energy
National policy and guidance
Regional and strategic policy
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Local policy, plans and construction guidance
Wales — renewable energy — coverage and notes
Wales — renewable energy
National policy and guidance
Regional and strategic policy
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Local policy, plans and construction guidance
No separate entry is included at this level in this register. Check the applicable plan and guidance for the site.
Major energy infrastructure: national policy statements — coverage and notes
Major energy infrastructure: national policy statements
National Policy Statements apply through the relevant infrastructure consenting regime; they should not be presented as the development plan for every local planning application. The 2025 versions of EN-1, EN-3 and EN-5 came into force on 6 January 2026.
Electronic Communications Code: land rights, apparatus and relocation — coverage and notes
Electronic Communications Code: land rights, apparatus and relocation
This section concerns rights relating to communications apparatus on land, including rooftop sites affected by redevelopment. Planning consent and Code rights serve different purposes. Resolve operator engagement, apparatus relocation and service continuity alongside the planning programme.
Related planning provisions: see England’s regional policy entries for London’s adopted connectivity requirements and the emerging Draft London Plan MBUL4 service-continuity provisions. The draft’s discussion of Notices to Quit is planning context; it is not a statement of the statutory Code termination procedure.
Technical sources and related regulation
Technical sources and related regulation
Safeguarding, spectrum information, building regulations and equipment compliance support the assessment. Their scope and legal role differ from development-plan policy.
Aerodrome and technical-site safeguarding
Safeguarding direction and planning circular
Aerodrome and technical-site safeguarding
Reference: England/Wales: Direction 2002 and Circular 01/2003
Establishes consultation arrangements for safeguarded airports and technical sites, with implications for building height, design and air-navigation apparatus.
For your development: Tall buildings, cranes and turbines may need airport, NATS and MOD engagement; check the actual safeguarding map and technical interests.
Building Regulations: digital connectivity
Building-regulation guidance for England
Building Regulations: digital connectivity
Reference: Approved Document R, volumes 1 and 2, 2022 editions
Volume 1 concerns new dwellings; volume 2 concerns other new buildings and major renovations. These requirements complement planning policy.
For your development: Coordinate ducts, access points and network provision with the design team. Part R compliance does not establish that neighbouring signals are unaffected.
CAA wind-turbine guidance
Current aviation technical guidance
CAA wind-turbine guidance
Reference: CAP764, version 7.1, 10 September 2026
Covers aviation implications of wind turbines and provides the current CAA reference for developers and aviation stakeholders.
For your development: Use the current edition when scoping radar, navigation, lighting and aviation assessments.
Electromagnetic Compatibility Regulations
Equipment and installation regulation
Electromagnetic Compatibility Regulations
Reference: 2016 Regulations; separate GB and Northern Ireland guidance
Addresses electromagnetic disturbance from relevant equipment. Product compliance and installation design should be distinguished from physical signal obstruction.
For your development: For inverters, battery systems and electrical plant: consider relevant EMC evidence where interference is a credible concern.
Ofcom fixed links and spectrum information
Regulator information; not planning permission
Ofcom fixed links and spectrum information
Reference: Fixed terrestrial links and Spectrum Information System
Ofcom no longer provides a dedicated wind-farm coordination facility. Published spectrum/link information is a useful screening source; operator engagement remains important.
For your development: Identify affected operators and assess link geometry. A screening distance or Fresnel envelope is a technical tool, not a nationally prescribed planning buffer.
Scottish aerodrome and technical-site safeguarding
Safeguarding framework
Scottish aerodrome and technical-site safeguarding
Reference: Scottish Direction/Circular 2/2003, revised
Scotland has its own safeguarding direction and circular. English planning procedures should not simply be applied unchanged.
For your development: Use the Scottish procedure and relevant operator consultations.
Development types and assessment scope
Development types and assessment scope
| Development | What to consider | Policy starting points |
|---|---|---|
| Tall buildings, extensions and large structures | TV/radio shadowing and reflections; microwave paths; neighbouring mobile coverage; rooftop apparatus; cranes and aviation systems. | England NPPF P4(3); London D9/SI6 and draft MBUL3/4; PPW 5.2.20; Belfast DES3; local tall-building and validation requirements. |
| Onshore wind, repowering and life extension | Full blade-swept envelope, broadcast reception, fixed/utility links, radar/navigation, cumulative layouts and mitigation. | England W3 and technical PPG; Scotland NPF4 11(e); Wales Future Wales 17/18; NI SPPS 6.223–224; relevant local plan. |
| Offshore wind and associated infrastructure | Aviation/radar, offshore communications assets and cables, existing operators, shore connections and project phases. | EN-1/EN-3 where applicable; relevant marine, devolved and local policies. |
| Solar, battery storage and electrical plant | Relevant inverter/equipment emissions and EMC; aviation/glint and glare where necessary; effects from associated structures. | Applicable energy policy, EN-1/EN-3/EN-5 where relevant, local plan and equipment regulation. |
| New housing, commercial and mixed-use development | Usable fixed/mobile connectivity, infrastructure capacity, ducts/access points and protection of surrounding services. | London SI6/LPG; NPF4 24; PPW/Future Wales 13; local digital policies; relevant building regulations. |
| Telecoms masts, rooftop installations and small cells | Siting/design, sharing/alternatives, consultation, interference compatibility and applicable ICNIRP declaration. | England CO1/CO2; Scotland NPF4 24; Welsh national policy/code; NI SPPS/operative local policy; relevant permitted-development rules. |
| Demolition or redevelopment of an existing telecoms host | Service continuity, temporary works, replacement sites, access and timing of apparatus relocation. | London SI6/LPG and emerging MBUL4; applicable local policy; separate Electronic Communications Code arrangements. |
The issue is the possible effect, not simply the height of a building or its distance from a line on a map. A structure can obstruct a radio path, reflect broadcast signals or affect coverage; electrical equipment can cause emissions. These mechanisms require different evidence.
Development affecting existing communications: the developer’s responsibilities
Development affecting existing communications: the developer’s responsibilities
The central planning question is whether a new building, wind farm or other development would obstruct, degrade, interrupt or otherwise compromise an existing communications service. Supplying fibre to the new development does not demonstrate that neighbouring services are protected.
How to read this register: Direct protection tests come first below. Adopted plans, national decision-making policy, supporting text, validation requirements and emerging drafts have different roles. The detailed geographical sections identify their status and official sources. GTech’s suggested evidence is assessment guidance; it is not presented as additional policy wording.
| Provision and status | Trigger and protection test | What the applicant should address |
|---|---|---|
| England: NPPF P4(1)–(3) Current national policy | New construction and changes of use which may affect existing activities, expressly including electronic communications networks. Existing lawful current and permitted operation must be considered. | Demonstrate effective integration without unreasonable restrictions on the established activity. Distinguish P4(2), addressing impacts from an existing activity on new development, from P4(3)’s express coverage of interference caused by new development. |
| England: NPPF P5(1)(d), P6(1)(b) | Development affecting safeguarded facilities, defence capability or public-safety infrastructure, including emergency-services telecommunications. | Consult the relevant bodies and demonstrate that operational constraints are avoided; address alternative or replacement provision where relevant. P1 is related plan-making context rather than an equivalent applicant assessment rule. |
| London: SI6 A(3) Adopted London Plan 2021 | A proposal could reduce mobile connectivity in surrounding areas. | Take appropriate avoidance measures; mitigate a reduction which cannot be avoided. Assess surrounding services separately from demand and connectivity within the new scheme. |
| London: D9 C(2)(f) Adopted London Plan 2021 | A tall building or its construction could interfere with telecommunications, aviation or navigation. | Address the building envelope and temporary works, including cranes. Use the borough’s tall-building definition and applicable validation requirements; do not invent a uniform national height trigger. |
| Scotland: NPF4 11(e)(v) Adopted national development-plan policy | Energy-development design and mitigation must address effects on telecommunications and broadcasting installations, particularly transmission links. | Demonstrate that links are not compromised. Read alongside aviation and defence interests in 11(e)(iv) and cumulative impacts in 11(e)(xiii). |
| Wales: PPW 5.2.20; Future Wales 18(7) National policy and national development plan | Large or prominent buildings and structures, including turbines, can obstruct or reflect telecommunications and broadcast signals. Policy 18 supplies an electromagnetic-disturbance test for energy proposals within its scope. | Consider the affected existing services, avoidance and mitigation; apply the relevant energy consenting framework and local plan. Pre-assessed wind areas do not remove other impact tests. |
| Northern Ireland: SPPS Edition 2, 6.223–6.224 Current regional policy | Renewable-energy proposals may affect telecommunications, radar or related interests. | Address interference under the renewable-energy tests and related consultation provisions, alongside the applicable adopted local plan. Treat policies for installing telecom equipment as a separate category. |
| Energy infrastructure: EN-1 5.5.38–5.5.45 Designated NPS; relevant consent routes | Energy infrastructure may affect civil or military CNS systems, meteorological radar or other defence assets. | Provide assessment in the Environmental Statement, consult affected operators and bodies, assess cumulative effects and include mitigation in the proposal. Inform consultees when the design changes. EN-1 is not a blanket policy for every UK planning application. |
| Local protection and validation provisions Adopted policies and published checklists | Examples include Salford DG2, Brent BD2, Belfast DES3 and local wind-energy policies. Validation thresholds may capture proposals below a tall-building policy threshold. | Apply the exact local test and evidence trigger. Check supporting text, adopted modifications, supplementary guidance, site allocations and any relevant made neighbourhood plan. |
| Draft London Plan 2026: MBUL3, MBUL4, MBUL6 Emerging strategic plan | Proposed interference protection for development 30m and above; rooftop-mast assessment provisions over 30m; a separate Table 2.3 operator-engagement provision referring to schemes over 18m. | Explain construction effects, line-of-sight impacts, continuity, operator engagement and coordinated infrastructure design. Identify the draft version and assess its planning weight rather than describing it as adopted. |
Evidence that answers the protection test
GTech assessment guidance: Establish the relevant existing and permitted services; assess the actual building or full turbine blade-swept envelope and construction stages; identify obstruction, reflection or equipment-emission mechanisms; liaise with affected operators; and document avoidance, agreed mitigation, implementation timing and residual effects. Reception surveys, propagation modelling, microwave-path analysis and mobile coverage studies answer different questions and should be selected for the services at risk.
There is no single distance which establishes compliance with every policy. The wind-turbine guidance’s typical operator clearance and a microwave Fresnel-zone calculation are technical screening considerations, not substitutes for the policy test or operator agreement.
Coverage and local-plan checking
This register brings together national and strategic provisions across the four UK nations and verified local examples. It does not claim to enumerate every policy in every UK local or neighbourhood plan. For a particular development, complete the policy review for its authority, adjoining authorities where services may be affected, consent route and latest published drafts. Entries dealing only with new telecom installations or digital rollout are supporting context rather than direct evidence of a duty to protect existing services.
What should a planning assessment contain?
What should a planning assessment contain?
The following is GTech’s practical scoping checklist. It is not a claim that every application requires every study.
- Define the proposal: footprint, coordinates, ground levels, heights above ground and AOD, materials, roof plant, cranes and construction phases. For turbines, include blade-tip heights and the full swept envelope.
- Identify the policy and consent route: nation, authority, adopted plan, relevant emerging plan, validation triggers and pre-application advice. Use the correct edition and policy numbering.
- Establish the baseline: relevant broadcast reception, microwave paths, rooftop/mobile infrastructure, utility and other communications systems, and affected aviation technical facilities.
- Consult the relevant operators: record responses, technical constraints, outstanding matters and agreed assessment assumptions. Include airport, NATS or MOD interests where relevant.
- Assess the actual mechanism: TV/radio shadowing or reflections, radio-link clearance and Fresnel geometry, mobile-service obstruction, radar/navigation effects, or equipment emissions. Consider temporary and cumulative effects where relevant.
- Design mitigation: consider layout or height changes, antenna arrangements, reception remedies, revised turbine positions, operator-agreed link changes or phased relocation. Identify who will deliver each measure and when.
- Support the submission: provide proportionate modelling, surveys, plans, consultation evidence, conclusions and deliverable mitigation. Address relevant conditions and monitoring requirements.
- Verify delivery: where required, undertake baseline and post-construction surveys, investigate complaints and demonstrate compliance with agreed measures.
For a straightforward initial enquiry, send GTech the site address or postcode, location plan, proposed layout and heights. For a wind farm, include the turbine schedule. We can then scope the work needed to support the application.
Historical and superseded references
Historical and superseded references
| Previous reference | Updated treatment | Evidence |
|---|---|---|
| NPPF December 2024 and former paragraph numbering | Replace as the lead current England source with NPPF August 2026, CO1/CO2. Retain only where Annex A makes it relevant to plan preparation. | Official source |
| Scottish Planning Policy 2014 and NPF3 | Superseded by NPF4 in February 2023. | Official source |
| PAN62: Radio Telecommunications | Replaced by Scottish digital telecommunications planning guidance in December 2023. | Official source |
| Wales TAN19: Telecommunications | Revoked; use PPW, Future Wales and the Welsh mobile-development code. | Official source |
| Northern Ireland PPS10 TEL2 | Cancelled. Do not reproduce its former TV-interference test as current policy. | Official source |
| Northern Ireland PPS18 policy | Cancelled December 2025; relevant Best Practice Guidance has a separate retained role. | Official source |
| Salford Publication Local Plan January 2020 | Replace draft quotations with the adopted January 2023 plan and adopted modifications. | Official source |
| Birmingham High Places 2003 / 2016 review press article | Use the adopted 2022 Design Guide as the principal current guidance source. A press article is not planning policy. | Official source |
| 2025 draft EN-1, EN-3 and EN-5 | Use the designated 2025 versions in force January 2026, checking project-specific transitional arrangements. | Official source |
| Old agency names and obsolete contact routes | Remove references to the ITC and Radiocommunications Agency; use current regulator/operator information. | Official source |
Some currently published guidance still contains historical paragraph references, agency names or consent thresholds. Those passages should be checked against later policy and legislation; they should not be copied unquestioningly into a new planning submission.
PPS18: policy cancelled, guidance retained where relevant
Historical policy / supporting guidance
PPS18: policy cancelled, guidance retained where relevant
Reference: SPPS preamble and paragraph 1.12
PPS18 policy was cancelled in December 2025. Its Best Practice Guidance remains relevant unless replaced.
For your development: Use current SPPS energy policy and identify guidance separately.
Salford Telecommunications SPD: do not cite it as current policy
Revoked guidance — historical reference only
Salford Telecommunications SPD: do not cite it as current policy
Status: Salford revoked its Telecommunications SPD on 19 January 2024. The council states that documents in its planning-policy archive have no formal policy status and are not capable of being material considerations when determining applications.
Current assessment basis: Use adopted DG1 for digital infrastructure and telecommunications development, DG2 for protection of existing infrastructure, EG2 where renewable-energy proposals are involved, and Places for Everyone JP-C2 where relevant.
Practical consequence: Older assessment templates or online policy lists that still rely on the Telecommunications SPD must be updated. Historical television-reception provisions should not be presented as an additional current SPD requirement.
Common planning questions
Common planning questions
Can a tall building affect digital TV or radio?
Yes. Digital services can still be affected by obstruction and reflection. A baseline reception survey and impact assessment can establish the relevant local conditions and suitable mitigation.
Is there a single UK distance limit around a microwave link?
No single distance in this register is a universal approval test. Requirements depend on the link, frequency, antenna geometry, building or turbine envelope and operator criteria. A screening result helps decide whether detailed work is needed.
Does an emerging plan replace an adopted plan?
No. The plan’s stage and relevant policy weight must be established. For example, the Draft London Plan 2026 remains emerging at the review date.
Does an airport height check cover all safeguarding issues?
A height-zone check is an initial screen. Radar, navigation and other technical effects can require separate assessment and consultation, even where a proposal does not penetrate an obstacle limitation surface.
Will an assessment guarantee planning permission?
An assessment helps demonstrate compliance, resolve technical concerns and support a well-prepared submission. The planning authority or consenting body determines the application against all relevant considerations.
Resolve technical issues before they delay your project
GTech supports developers, planners and design teams with telecommunications impact assessments, TV/radio reception surveys, microwave-link modelling and aviation safeguarding assessments. Early investigation helps identify practical solutions while your scheme can still be adjusted.
Contact GTech about your development • 01926 744771 • office@gtechsurveys.com